Zoeller STBB200 Manual De Instrucciones página 7

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

INSTALLATION INSTRUCTIONS
7. Use the included anchors to install the
controller. For best cooling, attach to wall. The
controller must be installed at least 3 ft. above
the sump basin.
8. Place the battery inside the battery box and connect
the leads from the controller to the battery terminals.
Connect positive (+) lead to positive terminal on the
battery and black negative (-) lead to the negative
battery terminal.
NOTE: If wires are not connected properly, a loud,
constant audible alarm will sound until the leads are
attached to the correct terminals.
9. Connect backup pump and float leads to the
controller
7
8
9
From float
7
© 2020. All rights reserved.
Anchors
AC
FLOAT
POWER
STATUS
24/7 BASEMENT
PROTECTION
DC
BATTERY
PUMP
USB
1-800-584-8089
DC
BasementSentry.com
RESET
FLOAT
PUMP
To controller
by
P L U S
AC
FLOAT
POWER
STATUS
24/7 BASEMENT
PROTECTION
DC
BATTERY
PUMP
USB
DC POWER
1-800-584-8089
+ 15V DC 1.6A
DC
FUSE
BasementSentry.com
RESET
FLOAT
PUMP
30 AMP
From
From battery
backup
pump
by
TEST
SILENCE
DC POWER
FUSE
+ 15V DC 1.6A
30 AMP
Controller
Minimum
3 ft.
Sump
Basin
TEST
SILENCE
From battery
charger

Publicidad

Tabla de contenido
loading

Tabla de contenido