Hach TitraLab SO2 Manual Básico Del Usuario página 10

Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 17
Electrical connection of the magnetic stirrer
1.
Connect the cable of the magnetic stirrer to the STIRRER port on
the back of the TitraLab.
The power is supplied via the TitraLab.
Installation of tubes
WA R N I N G
Risk of injury
During the first days of system use, check and tighten the screw connections for
all tubes to avoid leaks and potential escape of reagents.
Make sure that the tubes are never kinked.
Regularly check the system as well as all tubes and connections for
leaks, condition and cleanliness.
To prevent twisting of the tubes, you should always connect flange tube
connections before those with grommets.
Removal of protective stickers
1.
Remove the protective stickers on the burette valve and the four
pump connections.
2.
Make sure that the pre-installed white O-rings are not removed.
3.
Check that the O-rings are in a horizontal position inside the thread.
English 10
Figure 4 Position of protective stickers
Connection of feed tubes
The system is delivered with three feed tubes with bottle closures (DIN
45 thread). These feed tubes are supplied pre-installed on the TitraLab
and only need to be connected to the relevant reagent bottles.
1.
Connect the tube from the burette valve to the titrant bottle. Screw
onto the bottle closure to do this.
2.
Connect the tube from the IN socket of the ACID pump to the acid
bottle. Screw on the bottle closure to do this.
3.
Connect the tube from the IN socket of the ALKALI pump to the
alkali bottle. Screw on the bottle closure to do this.
4.
Place a desiccant cartridge in each bottle closure.

Publicidad

Tabla de contenido
loading

Tabla de contenido