CALIBRATION AND SETTING UP
Legend
1 Ratio V
2 Ratio N
3 PL Air pressure check point
4 PBr Gas pressure check point
5 PF Combustion chamber pressure check point
ENSURE THAT THERE ARE NO LEAKS FROM THE GAS RAMP
- Ignite the burner which will stabilise at maximum delivery.
- To insert a gauge for the measure of the pressure of the gas to the head of the burner.
- Measure the CO
- Check the meter to see whether gas delivery is as required. If necessary, finely adjust the servo control of the
air valve on cam I until the desired value is achieved.
- Once the correct gas delivery has been achieved, repeat combustion tests and, if necessary, adjust the gas/
air ratio by turning screw 1.
- Place the burner in first stage position at minimum delivery (by means of the corresponding cam) and repeat
the combustion test if the values are different to those previously found (at maximum delivery) by adjusting
screw 2 and observing the operation through opening 2
UK
- When making final inspection of CO
those corresponding to various intermediate outputs as the burner is set for continuous modulation operation.
in the fumes and if necessary turn screw 1, observing the operation through opening 1
2
and CO levels, minimum and maximum deliveries should be followed by
2
.
a
44
.
a