Installation and User Manual Piccolo Pure
Contents
1.1.
1.2.
1.3.
1.4.
2.1.
2.2.
2.3.
2.4.
2.5.
2.6.
2.7.
2.8.
2.9.
Figures and tables
Figure 1 and 2 sensor is installed 40 mm from the ceiling on the centre line
Figure 3
Sensor installation to the ceiling
Figure 4
OLET 31 sensor position in a ceiling installation......
Figure 5
Heater wall mounts on the heater in wall installation.
Figure 6
Heater wall mounts on the heater in corner installation
Figure 7
Location for the connection box
Figure 8
Order of RJ 10 connectors. Sensor, Door switch, Remote control,
Figure 9
Installing the door switch
Pin - order of RJ 10
Figure 10
Figure 11
Wiring diagram for the sauna heater
Figure 12
Rekommended sauna room ventilation
Figure 13
Priciple image when Pure is used as control panel
Table 1 Safety clearances
Table 2 Connection cable and fuses
Table 3 Coupling order of RJ connectors to circuit board
Table 4 Connecting the door switch.
Table 5 Piccolo Pure spare parts list
Page
.
3
3
3
3
4
4
4
4
5
6
6
7
7
8
9
10
10
11
11
12
13
14
15
5
5
5
5
5
7
7
8
8
9
10
13
5
6
7
8
14
2