Installation; Unpack The Machine; Unfold The Lower Handle; Install The Upper Handle - GreenWorks Pro MO60L05 Manual Del Operador

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

EN
6

INSTALLATION

Do not change or make accessories that are not
recommended by the manufacturer.
Do not put in the safety key or the battery pack until you
assemble all the parts.
6.1

UNPACK THE MACHINE

Make sure that you correctly assemble the machine before
use.
If the parts are damaged, do not use the machine.
If you do not have all the parts, do not operate the
machine.
If the parts are damaged or missing, speak to the service
center.
1. Open the package.
2. Read the documentation in the box.
3. Remove all the unassembled parts from the box.
4. Remove the machine from the box.
5. Discard the box and package in compliance with local
regulations.
6.2

UNFOLD THE LOWER HANDLE

4
1. Pull and turn the handle knobs (12) 90°.
2. Unfold the lower handle (4).
3. Line up the handle knobs in one of the three positions
(13) on the brackets.
WARNING
WARNING
WARNING
WARNING
12
English
4. Turn the handle knobs 90° until they engage the holes in
the brackets.
Make sure that the two handle knobs are in the same
position.
Do not damage or pinch the cables when you fold or unfold
the handle.
6.3

INSTALL THE UPPER HANDLE

15
1. Align the holes in the upper handle (3) and the lower
handle (4).
2. Put the bolts (14) through the holes.
3. Tighten the knobs (15) onto the bolts.
4. Do the same operation on the other side.
13
8
NOTE
WARNING
3
4
14

Publicidad

Capítulos

Tabla de contenido
loading

Tabla de contenido