5.1 CHECKS ON THE GATE

Before proceeding to the installation of the motor it is recommended to check the following on the gate:
The gate must be level
The gate must be in good condition
The gate must not have protuberances that collide with the ground or other objects
The gate must not hit or crawl the ground at any point of the race
The gate must be easily opened and closed for the full width of its run and must be supported only by its hinges
The gate must meet the weight and size requirements indicated in this manual

5.2 PREPARATION OF THE INSTALLATION SITE

2
3
4
5
Prepare on the installation site the ducts for the passage of motor cables.
The cables for the connection of the various devices in a typical plant are listed in the table below and must be suitable for the type
of installation, for example we recommend a cable type H07RN-F for outdoor installation.
TABLE 6 - Cables to be used
CONNECTION
Power supply line
Motor
Flashing light
Photocell - transmitter
Photocell - receiver
Key selector
* If the cable exceeds 10 m, a cable with a larger section must be used and a safety grounding must be installed near the auto-
mation.
6-1624982 - rev.3 - 03/11/2021
6
7
8
9
6
7
8
9
CABLE
3 x 1,5mm²
4 x 1,5mm²
2 x 0,5mm²
2 x 0,5mm²
4 x 0,5mm²
4 x 0,5mm²
10
11
12
13
10
11
12
13
DUCT
MAXIMUM LENGTH
20 m *
10 m *
20 m
20 m
20 m
20 m
14
15
16
17
14
15
16
17
English - 9
18
IRD
Data/date Disegnatore/designer
MATER
altern
TRATTA
Progetto/Project:
Via dell'Artigianato 1
DENOM
32026 -Borgo Valbelluna (Bl)
tel. +39 0437 751175 fax +39 0437 751165
info@allmatic.com - www.allmatic.com
Al
Il presente disegno è di proprietà della
18

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Hyper 600

Tabla de contenido