Installation Instructions
Installation of CO
The CO
cylinder does not come fi lled. The cylinder
2
must be fi lled with CO
Place the charged cylinder into the support stand.
Attach the CO
regulator to the cylinder by turning
2
the regulator nut onto the cylinder valve, making sure
the washer is securely inserted into the connecting
nut. Tighten snug using an adjustable wrench (not
supplied) and ensure there are no leaks, i.e. no hissing
sounds when the CO
Installation of CO
Remove the plug located at the exterior back of the
cabinet, in the top left hand corner. Save the plug
for later use if you decide to convert the unit to a
refrigerator.
Feed the gas line through the cabinet and out through
the uncovered hole.
Attach the open end of the hose to the hose barb
connection on the regulator. Secure the hose by using
one clamp provided. Use pliers or a screwdriver to
tighten the clamp to prevent leaks
Installation of the Beer Tower
•
Remove the plug from the top of the fridge cabinet
by twisting and pulling out. Save the plug for
later use if you decide to convert the unit to a
refrigerator.
•
Unravel the beer line (clear hose) from the tower
and insert the beer line and wing nut through the
uncovered hole on top of the unit.
•
Lock the beer tower assembly to the top of the unit
and make sure to position the beer faucet so it is
aligned with the front of the cabinet.
•
The rubber gasket can be used to make the
connection between the tower and the cooler
tighter if needed. If the beer tower will not turn
to lock in place, try removing the rubber gasket.
(The rubber gasket may not be required in all unit
confi gurations).
•
If the tower faucet is leaking or if the beer is very
foamy, ensure that the washers inside the faucet
are intact. Replace the washers with spare parts
from the accessory bag, if necessary.
Cylinder and CO
2
before use.
2
is turned on.
2
Air Line Outside Cabinet and CO
2
.
Regulator
2
2
1. Tap rocker washer
2. Tap valve washer
3. Tap valve spool washer
8
Air Line Hose to Regulator