The air filter must be kept clear of obstructions which could
reduce air flow to the air compressor.

HUMID AREAS

In frequently humid areas, moisture may form in the pump and
produce sludge in the oil, causing running parts to wear out
prematurely. Excessive moisture is especially likely to occur if
the unit is located in an unheated area that is subject to large
temperature changes. Two signs of excessive humidity are external
condensation on the pump when it cools down and a "milky"
appearance in
compressor oil. You may be able to prevent
moisture from forming in the pump by increasing ventilation or
operating for longer intervals.

NOISE CONSIDERATIONS

Consult local officials for information regarding acceptable
noise levels in your area. To reduce excessive noise, use
vibration mounts or silencers, relocate the unit or construct total
enclosures or baffle walls. Contact a D
call 1-888-895-4549 for assistance.
Anchoring of the Air Compressor
WARNING: Risk of bursting. Excessive vibration can weaken the
air tank and cause an explosion. The compressor must be properly
mounted.
The air compressor MUST be bolted to a level, solid concrete
surface. Use 3/8" lag screws, vibration pads and concrete
anchors. If help is needed anchoring the air compressor consult
a licensed contractor.
1.
Place the air compressor on a level, solid concrete surface.
Make sure the concrete is in good condition with no cracks
or damage.
2.
3.
4.
5.
6.
WALT service center or
e
7.

Wiring Instructions

may void its warranty and your fire insurance. Have circuit wiring
performed by qualified personnel such as a licensed electrician who
is familiar with the current national electrical code and any prevailing
local electrical codes.
grounding can result in electrical shock. The wiring should be done
by a qualified electrician.
A qualified electrician needs to knows the following before wiring:
1.
12
Mark the surface
using the holes in
Vibration
pad
the air compressor
(not
feet as a template.
supplied)
Drill holes in the
surface
for
the
concrete
anchors.
Install
concrete
Shim Under
anchors.
Vibration pad
Line-up
holes
in
(not supplied)
surface with holes in
air compressor feet.
Place the vibration pads (not supplied) between the floor and
air compressor feet, see figure. If needed use shims to level
the unit.
Place the 3/8" lag screws through the air compressor feet,
vibration pads and into the anchors.
Torque 3/8" lag screws to 7-10 ft.-lbs (9.5-13.5 Nm).
WARNING:
Improper electrical installation of this product
Risk of electrical shock. Improper electrical
WARNING:
The amperage rating of the electrical box should be adequate.
3/8" Lag
Screw
(not supplied)
Surface Line
Concrete Anchor
(not supplied)