Safety Guidelines

1.
Follow the installation instructions.
2.
Use the appliance
• according to its intended use
• in good condition
• with due regard to safety and risk of danger.
3.
Note that the appliance is exclusively for use in the
applications detailed in these installation instructions
(see 2 Technical Data). Any other use will not be
considered to comply with requirements and would
invalidate the warranty.
4.
Please take note that any assembly, commissioning,
servicing and adjustment work may only be carried
out by authorized persons.
5.
Immediately rectify any malfunctions which may
influence safety.
2

Technical Data

Media
Medium:
Connections/Sizes
Connection sizes:
Nominal sizes:
Pressure values
Max. inlet pressure:
Outlet pressure:
Min. pressure drop:
Operating temperatures
Max. operating temperature
medium (10 bar):
Max. operating temperature
medium accord. to EN 1567:
3
Assembly
3.1 Installation Guidelines
Horizontal and vertical installation position possible
– In vertical installation position spring bonnet with
adjustment knob facing upwards
Install shut-off valves
The installation location should be protected against
frost and be easily accessible
– Pressure gauge can be read off easily
– Simplified maintenance and cleaning
To guarantee perfect functioning, a filter must be
inserted ahead of the pressure reducing valve
Provide a straight section of pipework of at least five
times the nominal valve size after the pressure
reducing valve (in accordance with EN 806-2)
Requires regular maintenance in accordance with
EN 806-5
Drinking water
3
1
3
/
",
/
",
/
"
8
2
4
10, 15, 20
16 bar
1.5 - 6 bar
1 bar
70 °C
30 °C
GB
3.2 Assembly instructions
CAUTION!
When using soldering connections, do not solder
the connections together with the pressure
reducing valve! High temperature will irreparably
damage important internal working components!
1.
Thoroughly flush pipework
2.
Install pressure reducing valve
• Note flow direction
• Install without tension or bending stresses
3.
Set outlet pressure
The green adjustment knob must stay plugged on to
prevent dirt from entering.
4
Start-up
4.1 Setting outlet pressure
Set outlet pressure min. 1 bar under inlet pressure.
1.
Close shut-off valve on inlet
2.
Release pressure on outlet side (e.g. through water
tap)
3.
Fit manometer (standard version)
4.
Close shut-off valve on outlet
5.
Fit adjustment knob
6.
Slacken tension in compression spring
• Turn adjustment handle counter clockwise (-) until
it does not move any more
7.
Slowly open shut-off valve on inlet
8.
Turn adjuster knob until the manometer shows the
desired value
9.
Slowly open shut-off valve on outlet
5
Maintenance
In order to comply with EN 806-5, water fixtures must
be inspected and serviced on an annual basis.
As all maintenance work must be carried out by an
installation company, it is recommended that a
servicing contract should be taken out.
In accordance with EN 806-5, the following measures must
be taken:
5.1 Inspection
1.
Close shut-off valve on outlet
2.
Check outlet pressure using a pressure meter when
there is zero through-flow
• If the pressure is increasing slowly, the valve may
be dirty or defective. In this instance, carry out
servicing and cleaning (See 5.2 Maintenance)
3.
Slowly open shut-off valve on outlet