Cable Management
1.
Fully extend the arm [03]. Remove cable covers (C).
2.
Install the cable tie clips [29] into the bottom of the arm, as shown.
3.
Pull each arm to its full extension then route the cables through the
arm, leaving enough slack to prevent stretching the cables when the
arm is moved.
4.
Reattach covers (C).
2
[29]
4
(C)
(6901-002114 <00>)
[29]
1
(C)
[03]
3
5
[01]
[03]
15