GE PTD60GBPRDG Instrucciones De Instalación página 4

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

CONNECTING A GAS DRYER (skip for electric dryers)
TOOLS YOU WILL NEED
10" (25.40 cm)
Adjustable wrenches (2)
8" (20.32 cm)
Pipe wrench
MATERIALS YOU WILL NEED
4" (10.2 cm) dia. metal
elbow
Pipe compound or
PTFE tape
Flexible gas line
connector
Duct clamps (2) or
Spring clamps (2)
Safety glasses
4" (10.2 cm) dia. metal
duct (recommended)
4" (10.2 cm) dia.,
UL-listed flexible
metal duct (if needed)
Installation Instructions
Flat-blade
screwdriver
Slip-joint pliers
Level
Gloves
Soap solution for
leak detection
Exhaust hood
Duct tape
Gas pipe adapters (2),
elbow and pipe plug
4" Cover Plate
(Kit WE49X22606)
(if needed)
• Before beginning the installation, turn off the circuit
breaker(s) or remove the dryer's circuit fuse(s) at
the electrical box. Be sure the dryer
cord is unplugged from the wall.
• Turn the dryer's gas shut-off valve in the supply line
to the OFF position.
Shut-off
Valve
• Disconnect and discard old flexible gas connector
and ducting material.
4

Publicidad

Tabla de contenido
loading

Tabla de contenido