Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

Installation instructions
SECURY 21 EK | 21 EK EVP | 21 S | 21 S EVP
Multi-point locks electrically couplable or with monitoring contacts
3.2
Requirements
Before installation of the multi-point lock in the door leaf, make all
fastening holes and passages for hardware, door closers, etc.
Install the cable so that it cannot be damaged. The cable must not touch
the connecting rods!
Install hardware with a mechanism to hold them up if lever handles are to
be monitored.
If you use a cable duct, install it on the hinge side of the door to avoid
damage to the cable at any door position.
To permit unhinging of the door leaf, the connection of the cable duct to
the connecting cable on the hinge side must be easy to release.
Installation dimensions for SECURY 21 EK / 21 EK EVP/ 21 S / 21 S EVP
Installation and milling dimensions, as well as approved door hardware,
strikers, latch&deadbolt strikers and one-piece strikes can be found on the
installation drawings included in the delivery.
We would be happy to provide you the drawings, if needed.
DE
42
All manuals and user guides at all-guides.com

Mounting

EN
FR
ES
04.2016 | G31347 | Designed in Germany

Publicidad

Tabla de contenido
loading

Tabla de contenido