Kohler K-300 Instrucciones De Instalación página 5

Válvula flujo alto de 1/2 de bañera montada sobre la bañera/cubierta
Ocultar thumbs Ver también para K-300:
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

NOTE: This frame applicable to rough (unfinished) deck
installations only. (Excludes K-300-KR and K-P300-KR)
Back off threaded collars as far as possible without
removing them. Pivot the valve bodies enough to remove
the tee and two pieces of tubing. (If valve body holes are
smaller than recommended, it may be necessary to
remove the entire valve body assembly.)
Install tubing into tee. Mate copper tube from tee with
spout supply tube. Pivot the valve bodies onto the two
pieces of copper tubing.
Do not solder at this time.
NOTE: This frame applicable to rough (unfinished) deck
installations only. (Excludes K-300-KR and K-P300-KR)
Reset Valve Body Height: Adjust the threaded collars
until the dimension from the top of sleeve to the top of the
rough deck surface equals the the clearance requirement
you calculated in frame Fig. #6.
NOTE: This frame applicable to rough (unfinished) deck
installations only. (Excludes K-300-KR and K-P300-KR)
Tighten mounting nuts on each valve body underneath
deck.
Solder copper tubes to valve bodies, tee and spout supply
tube.
Ensure cold supply is on right hand side.
Solder hot and cold water supply tubes to valve body
inlets.
Proceed to Section 3.
Kohler Co., Kohler, WI U.S.A.
Sleeve
Threaded
Collar
Rough
Deck
Mounting
Nut
Copper
Tube
Top Of Sleeve
Pre-Determined
À À À À
É É É É
Clearance
Requirement
É É É É
É É É É
Copper
Tube
Rough
Deck
Valve
Body
Mounting
Nut
Solder
Hot
Supply
5
Spout Supply
Tube
Tee
Fig. #8
Tile Thickness
Threaded Collar
Rough Deck
Fig. #9
Spout Supply Tube
Solder
Solder
Cold
Supply
Fig. #10
1013511-2-
A

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

K-p300K-300-krK-p300-krK-300mK-p300m

Tabla de contenido