Descargar Imprimir esta página

Bronpi HYDROBRONPI Serie Instrucciones De Utilizacion página 9

Publicidad

6) Es recomendable que todos los componentes de la instalación (válvula de
seguridad, circulador, vaso de expansión etc.)se coloque en el retorno
The home - boiler is supplied with a over- presion valve of 3 bar. Any hydraulic
part of the installation (keys of court, bombs, valves, probes etc) is supplied. The
exception is the kits that are optional and their components and characteristics
are described in the paragraph 7 of this manual.
The model, effects the diffusion of the heat, for conduction of the device to the
radiant fluid, which is the water of the circuit of heating. Another very important
part of the generated power spreads for radiation of the walls and convection.
The normal functioning of the model, implies that the door of load is totally
closed, effecting the control of the combustion with the controls that are
described previously.
Connection to the circuit of heating:
The model possesses in the top side and in the right, two fittings of 1 ", we will
use the superior to connect the exit of the circuit of heating (way out) and the
lower one to connect the return of the circuit of heating. It will be possible use
the fittings of the right as well as the left ones (according to convenience of the
installation), logically the two racores that are not used will have to be covered
with their corresponding stoppers. "Likewise a racor of ½" is present" for the
insertion of the probe of temperature for the safety system and other two
racores of 3/8 " that are the entry and exit of the coil of stainless steel. of the
safety system.
It is very important, that both the connection and the circuit of heating, are
realized by professional staff.
The circuit is to be provided with the corresponding measures of safety.
The model must never be established for boiler, must be installed in a circuit
with accelerating bomb.
It is advisable to install the thermostat of on-off, of the bomb nearby possible
mas to the exit of warm water of the large water deposit.
Once the chimney is connected to the circuit of heating, we will fill the circuit
and will prove the functioning during 2 - 3 days, rejecting the possibility of
escapes. Verified this we will be able to re-dress the chimney
It is necessary to design a circuit of heating that when it is functioning on its
highest efficiency, water can´t be warmer than 90ºC to avoid werheating and
werpressure.
For the case when the water of the circuit reaches high temperatures that could
provoke a heat excess (when water Stara to boil), the model includes a safety
system that consists of a coil of stainless
system that consists of a coil of
system that consists of a coil of
system that consists of a coil of
the boiler and that by means of the opportune connections removes the heat
excess. (To see basic scheme of installation). It is recommended that the circuit
should possess other systems to remove the heat, as radiator of " heat escape ", a
valve of thermal unload, a capture of cold water ... etc.
The circuit will have to possess a key of purge in it low part to facilitate to empty
it.
stainless steel
steel, that this in touch with the water of
stainless
stainless
steel
steel
he model includes a safety
he model includes a safety
he model includes a safety

Publicidad

loading