Descargar Imprimir esta página

Assembly; Installation Position - HEROSE 01420 Instrucciones De Servicio

Publicidad

Idiomas disponibles

Idiomas disponibles

5

Assembly

5.1

Installation position

With regard to the installation position, pay attention to the flow direction arrow. When installing the valve
in a horizontal pipeline, a vertical position of the spindle is recommended with the hand wheel at the top or
an inclination of up to 65° from the vertical.
5.2
Notes regarding the installation
Use suitable tools.
 Allen keys of sizes 6, 8, 10, 14, 19
 Open-ended spanners
 Torque wrench
 TIG welding machine
Clean tools before the installation
Open the packaging only directly before the installation. Freedom from oil and grease for oxygen
(O
)
2
Valves for oxygen are permanently marked with "O
Only install the valve if the maximum operating pressure and usage conditions correspond to the
marking on the valve.
Remove protective caps or covers before installing.
Inspect the valve for dirt and damage. DO NOT install a damaged or dirty valve.
Remove any dirt and residues from the pipeline and valve in order to prevent leaks.
Avoid damaging the connections.
The sealing surfaces must remain clean and intact.
Seal the valve with suitable seals.
No sealant (sealing tape, liquid sealing tape) may enter the valve.
Respect the suitability for use with O
Connecting pipelines must only be connected in a force-free and torque-free manner during
operation.
Stress-free installation.
In order to ensure trouble-free operation, no impermissible static, thermal or dynamic stresses
may be transmitted to the valve. Observe reactive forces.
Temperature-dependent changes in length in the pipeline system must be compensated with
expansion joints.
The valve is supported by the pipeline system.
Detailed installation instructions are included for shut-off valves with pneumatic or electric
actuator.
Driven valves: mounting/dismounting the bonnet in the middle position of the actuator.
The valve must be protected against dirt and damage during construction work.
Remove the blocking bushing after mounting.
Check the leak-tightness.
26
All manuals and user guides at all-guides.com
Operating instructions
.
2
Phone +49 4531 509-0
".
2

Publicidad

loading

Este manual también es adecuado para:

01423