Horizontal Alignment - Gree GMV-ND22PL/B-T Manual Del Propietário

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

Multi Variable Air Conditioners Floor and Ceiling Type Indoor Unit
Notes:
The length of bolt depends on the installation height of the unit, bolts are field supplied.
4.1.3 Lift the Unit
Lift up the unit to the ceiling and secure it on the bolt. Use specialized nut to secure the unit.
Notes :
①Before installation, please finish the preparation work of all pipes (connection pipe, drain pipe) and
wires (wired controller wire, connection wire of IDU and ODU) that need to be connected with the indoor unit.
②Punch holes on the ceiling (air return opening or air inlet). Ceiling may have to be strengthened to make
it level and to prevent it from vibration. You may consult user or constructor for details.
③If the ceiling is not strong enough, you can install a beam bracket in a corner and secure the unit on the
beam.

4.1.4 Horizontal Alignment

After the indoor unit is installed, remember to check the horizontal status of the whole unit. It should be
horizontal from front to back and slant 1% from left to right, following the drainage direction, as shown in
Fig.4.1.5.
Copyright 2018. This translation is property of GREE PRODUCTS SL. All rights reserved. Total or partial reproduction without its express authorization is prohibited.
Fig 4.1.3
Fig 4.1.4
8

Publicidad

Capítulos

Tabla de contenido
loading

Tabla de contenido