Monogram ZV850 Instrucciones De Instalación página 11

Ocultar thumbs Ver también para ZV850:
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

CONSTRUCT CEILING SUPPORT (Continued)
• Secure each 2 x 4 block with at least four (4), #10
wood screws, 3" long (not supplied). Use 8 wood
screws total for the two supports.
• The cross framing must be accurately aligned
to assure correct positioning of the hood.
• The cross framing must be level in all directions.
Check with a spirit level and adjust if necessary.
IMPORTANT: The ceiling structure must be capable
of supporting the weight of the hood (approximately
200 pounds) and any inadvertent user contact loads.
The hood support frame will be supported by the
2 x 4 cross framing.
Ductwork for Installations Vented to the Outdoors
• Use the shortest and straightest duct route
possible. For satisfactory performance, duct run
should not exceed 100 feet equivalent length for
any duct
configuration.
• Refer to "Duct Fittings" chart to compute
the maximum permissible length for duct runs
to the outdoors.
• This vent hood must use 6" round rigid duct.
WARNING:
OF FIRE, USE ONLY RIGID METAL DUCTWORK.
• Install the house ductwork to run horizontally
between ceiling joists or straight up through
the roof.
Finish the Ceiling
• Finish the ceiling surface. Be sure to mark location
of the ceiling joists and cross framing. Check to be
sure the ceiling is level; use shims if necessary.
All manuals and user guides at all-guides.com
Installation Preparation
TO REDUCE THE RISK
11
Ceiling joist
6"
Duct
2 x 4
Vent straight up
through the ceiling

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Zv855

Tabla de contenido