Installation - Recirculating; Step 1, Mount Template; Step 2, Install Upper Support Frame - Monogram ZV850 Instrucciones De Instalación

Ocultar thumbs Ver también para ZV850:
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

1
MOUNT TEMPLATE
• Align the template with the marks on the ceiling and
tape in place.
– Be sure the template is oriented correctly, with the
front of the hood.
• Use a plumb to be sure the mounting
holes will provide parallel alignment
with the countertop below.
• Center punch all hole locations.
• Drill pilot holes in the 4 screw
locations. Use a 5/32" bit and drill
approximately 1-1/2" deep.
• Cut wire access hole approximately
1" dia.
All manuals and user guides at all-guides.com
Installation Instructions
INSTALLATION – RECIRCULATING
Front of Hood
Wire Access Hole
658Dia28
2
INSTALL AIR DEFLECTOR AND
UPPER SUPPORT FRAME
The duct connector is shipped inside the deflector.
• Snap the plastic connector out of
the deflector and remove. Turn it
over. From the bottom, snap the
connector over the opening.
• Slide the assembled deflector into
the upper support frame and secure
with 4 small screws.
• Secure the upper support frame to
the ceiling joists and/or cross framing
with the 4 screws provided. For maximum rigidity
and strength, the screws must be driven into the center
of the joists and/or cross framing.
• Check to be sure the support frame is level, vertically
and horizontally.
17
NOTE: Be sure plastic
connector is installed on
the bottom of the
deflector as shown.

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Zv855

Tabla de contenido