Install Ceiling Support Structure - Monogram ZV850 Instrucciones De Instalación

Ocultar thumbs Ver también para ZV850:
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

CONSTRUCT CEILING SUPPORT
Plan the Location of the Hood and Ductwork
• Use a plumb bob to check the location.
The countertop/cooktop below the hood
must be centered with the hood.
• The hood should extend beyond the front and rear
edge of the cooking appliance.
• The duct in the ceiling must be centered over
the cooktop.
Ceiling Support Structure
• At the hood location, install cross-framing between
ceiling joists as shown. (2x4 wood supports
are required to support the weight of the hood.)
EXAMPLE A
16" Joist
spacing
All manuals and user guides at all-guides.com
Installation Preparation
Install cross-framing symmetrically over
duct/cooktop centerline
8-3/4"
Align duct
to center
of cooktop
Top view – ceiling joists parallel to front of hood
Align with
center of
cooktop
• Arrange cross-framing in the ceiling to suit
the existing structure.
• Your ceiling joists will be like one of the following
examples.
7-5/8"
6" Duct
2x4 Cross-framing
wood supports
Front
of
hood
9
Cooktop
outline

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Zv855

Tabla de contenido