Remove The Packaging; Check Installation Hardware - Monogram ZV850 Instrucciones De Instalación

Ocultar thumbs Ver también para ZV850:
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

REMOVE THE PACKAGING

CAUTION:
against sharp edges.
The vent hood is packed with the duct cover and
support frames.
• Remove the hood, parts and packaging.
• Remove junction box cover.
• Install strain relief onto junction box cover
(not supplied).
NOTE: Additional tools, materials and hardware are
required to construct your ceiling support.

Check Installation Hardware

Locate the hardware accessory bag packed with the
hood and check contents.
4 Hex-head
wood lag
screws
(6 mm x 2-1/2"
or 1/4 x 2-1/2")
(One is in the service
manual envelope.
Leave that screw in
4 (10 mm) Nuts
and lock washers
2 Utensil rods with 4 machine screws
All manuals and user guides at all-guides.com
Installation Preparation
Wear gloves to protect
2 Phillips-head
4 Flat
duct cover
washers
screws
2 Stop screws
the envelope.)
8 Frame
attachment screws
with washers
(attached to
accessory support
frames)
Support frames
with 8 screws
and 8 washers
Front of Hood
Template
Additional Parts for Recirculating Operation
Air deflector with upper
duct connector and 4
small flat-head screws
7
Mounting screw holes
Decorative
duct covers
3 Stainless
steel grease filters
3 Charcoal filters

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Zv855

Tabla de contenido