8. Programming the Receiver Operating Frequency
& High Speed Conditioning of Fan Control
IMPORTANT: Ceiling fan blades MUST be installed
before high speed conditioning can begin.
Within 1 minute of restoring electricity to the ceiling fan,
push and hold the fan OFF button (
to set the code in the receiver. The ceiling fan lights (if
installed) will blink to indicate the transmitted has been
paired with the receiver.
IMPORTANT: Immediately after successful pairing, the
ceiling fan will automatically begin high speed
conditioning of the motor. During conditioning, the
electronic motor control software is calculating
speeds for the 2nd through 5th speed settings based
on the blades that were installed on the fan.
The fan will run for approximately 2 minutes in the upward
direction then reverse direction to down flow and run an
additional 2 minutes. When conditioning is complete,
the fan will come to complete stop.
All manuals and user guides at all-guides.com
IMPORTANT: Do not interrupt the conditioning until
the fan comes to a complete stop in approximately
5 minutes. All functions of the control will be rejected
during conditioning.
) for 3 to 5 seconds
High speed conditioning is now complete.
If programming is unsuccessful, retry the above
instructions after cycling the wall control ON/OFF switch to
restart the 1 minute programming time period.
If still unsuccessful, shut off the electricity at the fuse box or
breaker panel and change the wall control frequency
(page 16). After changing the frequency settings, repeat
instruction #1 of this section within one minute of restoring
the electricity.
19
emersonfans.com
Please contact 1-800-654-3545 for further assistance
ETL Model No.: CF955L