6 Commissioning
Result
42
1
3. Switch on the DC switch disconnector.
|
Switch setting 1: Power unit of the string inverter is
switched on.
The AC and DC networks are switched on.
Once the AC and DC networks have been switched on, the
inverter activates the LED indicators and display. For
operation, a button is available on the left-hand side of the
device.
Start indicator
Conergy
Manufacturer
IPG 15 T
Device type
Commissioning the inverter
Language
GERMAN
Language selection
flashes
1. Press the button repeatedly until the required language
appears.
Language
ENGLISH
2. Press the button and hold it for longer to confirm the entry.
Operating manual
0
CLICK
1
0
Conergy IPG T series