Ready
Solar Gen-
erator
30–40 seconds may elapse before LED test.
The inverter only functions when a set of parameters is set.
Initialisation of power feed to grid may last 2–3 minutes.
Conergy IPG T series
| The solar power system polarity and voltage are correct.
| Position of the DC switch connector is correct.
LED indicators during commissioning
In parallel to commissioning, the inverter activates the LED
indicators.
Grid
Fault
LED is illuminated
LED is flashing
(LED lights up regularly)
LED is flashing
(brief illumination of the LED every 2 seconds)
LED is off
Flashing: The LED flashes evenly (250 ms on and 250 ms off).
Quick flash: The LED lights up briefly (80 ms) and then
remains off for a longer interval (1920 ms).
Operating manual
6 Commissioning
Meaning
≥ 300 V
U
Internal electronics are not
SG
DC
yet powered sufficiently.
Test of the LED indicators
The inverter does not have a parameter set
and is not therefore operational
Initialisation of power feed to grid:
audible clicking of the relay
Power feed to grid
Grid power available, standby operation of
inverter
45