HeatStar ERSP-40 Instrucciones De Operación página 16

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

FIGURE 10: Unvented Operation
(91cm)
1.
Ventilation equal to 4 CFM per 1,000 BTU/HR firing rate must
be provided in unvented heater installations
2.
For dimensions A "unvented" refer to ( Figure 1- Minimum
Clearances to Combustibles.)
FIGURE 10A: Single Wall
Single wall vent run
Single wall terminal end
18" (45cm) Min.
2"(5cm) Clearance thimble
required when flu pipe
extends through
combustible materials
(91cm)
3'-0" (91cm) Min.
6' (182cm) Min.
Pitch flue pipe down
toward outlet 1/4" per
foot (0.6 cm per 0.3m) for
condensate drainage.
2"(5cm) Clearance thimble
Enerco | Heatstar ERSP Series Heater
FIGURE 10b: Double Wall
Double wall vent run
Double wall terminal end
8"(20cm) to 10"(25cm) Max.
FIGURE 11: Vertical Venting
E-16
Operating Instructions and Owner's Manual
18" (45cm) Min. 3'-0" (91cm) Min.
6' (182cm) Min.
Pitch flue pipe down
toward outlet 1/4" per
foot (0.6 cm per 0.3m) for
condensate drainage.
18" (45cm)

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Ersp-80Ersp-125Ersp-175Ersp-60Ersp-100Ersp-150

Tabla de contenido