Sequence Of Operation - HeatStar ERSP-40 Instrucciones De Operación

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

SECTION 7
Wiring
Heaters are normally controlled by thermostats. Line voltage
thermostats are wired directly (see Figure 15), 24V thermostats
are wired directly by finding and removing the jumper wire on the
back of the burner box and wiring the thermostat to the terminals
(see Figure 16). Heaters must be grounded in accordance with the
National Electric Code ANSI/NFPA- 70 or current Canadian Electrical
Code, CSA C22.1. Heaters may also be controlled with a manual line
voltage switch or timer switch in place of the thermostat.
FIGURE 15: Line Voltage Thermostat Wiring
FIGURE 16: Low Voltage Thermostat Wiring
FIGURE 17: Ener-Radiant SP Burner Internal Wiring
If any of the original wire as supplied with the
appliance must be replaced, it must be replaced with
wiring material having a temperature rating of at
least 105°C and 600 volts.
Each burner must be electrically grounded in
accordance with the National Electric Code ANSI/
NFPA - 70 or current Canadian Electrical Code, CSA
C22.1.
Thermostat
Pressure Switch
RED
YELLOW
BLACK
BLACK
L1
T1
Line
Load
Blower Motor Cavity
WHITE
WHITE
N
GREEN
Earth Ground
Chassis Wiring Is 18 AWG / 105 Degrees C / @ 600 Volts
Igniter Wire Is 16 AWG / 25 KVDC / 10 KVDC
Crimp Caps Are # CE5 / 105 Degrees C
Igniter & Flame Sense
IGN
BLUE
RED/YELLOW
V2
RED
BLACK
YELLOW
C1
M
CONTROL BOARD
GV
GREEN
Replace Any Wiring With Same Ratings
All Quick Connects Are Fully Insulated (Except Igniter)
Enerco | Heatstar ERSP Series Heater
FIGURE 18: Ener-Radiant SP Burner Internal Wiring Ladder
Diagram
L1
PCB
T'STAT (Optional)
JUMPER (Optional)
SECTION 8
Operation & Maintenance

Sequence of Operation

1.
Turn the thermostat up. When the thermostat calls for heat,
blower motor will energize.
2.
When the motor approaches nominal running RPM, the air
proving switch closes and activates the ignition module.
3.
Once the igniter sparks, the gas valve is energized.
4.
If a flame is detected, the gas valve remains open. When the call
for heat is satisfied the system control mechanism de-energizes
the burner line voltage supply and the gas valve is turned off.
5.
If no flame is detected, the gas valve is closed, and a purge
period begins. After the purge, the module acts to power
the igniter for a second trial for ignition period. If flame is still
not established, a third and final purge and trial cycle begins.
FC-
After three trials, the module will lockout until reset. Reset is
FC+
GND
LED
accomplished by removing power from the module for at least
24 VAC
five (5) seconds (thermostat cycle required.)
L1
IND
NC
V1
PSW
TH
E-18
Operating Instructions and Owner's Manual
L1
PCB
IND
PCB
IGNITER/FLAME SENSOR
IGN
PCB
T1
PRIMARY - 120V
SECONDARY - 24V
24 VAC
PCB
PSW
TH
PRESSURE SWITCH
V1
GV
PCB
N
M
BURNER
PCB
V2
GND
PCB
Earth &
Chassis Ground

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Ersp-80Ersp-125Ersp-175Ersp-60Ersp-100Ersp-150

Tabla de contenido