Assembly Procedures - Tanaka TCG 24EBSP SL Manual De Instrucciones

Ocultar thumbs Ver también para TCG 24EBSP SL:
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

English

ASSEMBLY PROCEDURES

Installation of attachment
1. Join the attachment in place of it.
2. Make sure the lock pin (1) fi ts in the location hole
(2) of tube and that the tube will not come off .
(Fig. 1)
3. Tighten the knob nut (3) securely. (Fig. 1)
1
3
2
Installation of handle (Fig. 2)
Attach the handle to the drive shaft tube with the
angle towards the engine.
Adjust the location to the most comfortable position
before operation.
NOTE
If your unit has handle location label on drive
shaft tube, follow the illustration.
Throttle wire / stop cord
Press the upper tab (4) and open the air cleaner
cover. (Fig. 3)
8
Fig. 1
Fig. 2
Connect stop cords. (Fig. 4)
If the throttle outer end (5) is threaded on your unit,
screw it and the earth terminal (6) (if so equipped)
into the cable adjuster stay (7) all the way, and then
tighten this cable end using the adjuster nut (8)
against the cable adjuster stay (7).
Connect throttle wire end (9) to carburetor (10) and
install swivel cap (11) (if so equipped) where is
included in tool bag, onto swivel (10) (Fig. 5).
Press the upper tab (4) and close the air cleaner
cover. (Fig. 3)
Store stop cords (12) into the air cleaner cover.
(Fig. 6)
Some models may come with the parts installed.
7
6
5
4
Fig. 3
Fig. 4
11
10
9
8
Fig. 5

Publicidad

Tabla de contenido

Solución de problemas

loading

Este manual también es adecuado para:

Tcg 27ebsp slTcg 24ebdp slTcg 27ebdp sl

Tabla de contenido