Inserting The Battery; Indicators And Controls - Chauvin Arnoux E25 Guia De Inicio Rapido

Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 8
User's manual
Visit our web site to download the operating instructions for your instrument:
www.chauvin-arnoux.com
Search on the name of your instrument. When you have found the instrument, go to its page. The operating
instructions are on the right. Download them.

Inserting the battery

E25 clamp
1
Mobile jaw.
2
Fixed jaw.
3
Arrow indicating the direction of current flow.
4
2 male banana plugs 4mm in diameter.
5
Guard
6
Mobile arm.
7
Reset button.
8
ON and OL indicators.
9
Three-position slide switch.
10
Type B micro-USB connector for external power supply.
11
Battery compartment cover.
12
Screw of the battery compartment cover.
13
Fixed arm.

Indicators and controls

Three-position slide switch:
„ OFF: instrument off
„ 10mV/A: 80A range.
„ 1V/A: 2A range.
ON indicator
„ Off: instrument off
„ Lighted green: instrument on
„ Blinking green: the batteries will have to be replaced in less than 4h.
„ Lighted orange: permanent operation (auto off deactivated)
OL indicator
„ Off: the measurement is correct
„ Lighted red: the measurement exceeds the range
„ Lighted red for 3 seconds: the zero adjustment is in progress.
Zero adjustment button
„ Adjust the zero before each measurement by pressing this button.

Œ
5
Ž


EN

Publicidad

Tabla de contenido
loading

Tabla de contenido