Stenner Pumps S FIXED SERIE Manual De Instalación Y Mantenimiento página 19

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

SETTINGS
LEAK DETECT
page 3 of 3
7. Soak a small piece of sponge with the pumping solution and place over the two leak
detect pins, use the expected weakest solution and keep in mind some solutions
dilute with time.
8. Slowly turn the potentiometer counterclockwise until the LEAK LED blinks red.
9. Turn the potentiometer an additional one full turn counterclockwise.
10. Remove sponge and thoroughly clean the solution off pins and confirm they are dry.
IMPORTANT: Confirm there is no chemical residue remaining on the leak detect pins
and bracket.
11. Disconnect, then reconnect power. Confirm the LEAK LED is not lit. If lit, repeat steps
1-11. If the LEAK LED is not lit, go to step 12.
12. If the pump is not outdoors or exposed to water, go to step 14.
13. If the pump will be installed outdoors or exposed to water:
- Soak a small piece of sponge in water and
place over the two leak detect pins. If the tube
LEAK LED is lit, it indicates the conductivity of
the pumped solution and water is too close and
the pump cannot discriminate between the two.
The liquid end needs to be protected from
water intrusion to avoid a false tube leak signal.
- If the tube LEAK LED is not lit, the setting is complete.
14. Re-install the tube housing cover and the signal cover on the pump.
On Fixed models, remove the jumper wire connected in step 1.
15. Prime the pump.
16. Verify pump operation.
USA and Canada 800.683.2378, International 904.641.1666
continued
STBY /
LE K
OFF
S Fixed & Variable Series
POWER
19

Publicidad

Capítulos

Tabla de contenido
loading

Este manual también es adecuado para:

S variable serieS4f serieS4v serieS3f serieS3v serie

Tabla de contenido