Zoeller 49 Serie Instrucciones De Instalación
Zoeller 49 Serie Instrucciones De Instalación

Zoeller 49 Serie Instrucciones De Instalación

Ocultar thumbs Ver también para 49 Serie:

Publicidad

Idiomas disponibles

Idiomas disponibles

Enlaces rápidos

Notice to installing contractor: Instructions must remain with installation.
Your Peace of Mind is Our Top Priority
Product information presented
here reflects conditions at time
of publication. Consult factory
regarding discrepancies or
inconsistencies.
PREINSTALLATION CHECKLIST - ALL INSTALLATIONS
1.
Inspect your pump. Occasionally, products are damaged during shipment. If the unit is damaged, contact your dealer before using. DO NOT remove the test plugs in the cover nor the motor housing.
2.
Carefully read the literature provided to familiarize yourself with specific details regarding installation and use. These materials should be retained for future reference.
1. Make certain that the receptacle is within the reach of the pump's power supply cord. DO NOT
USE AN EXTENSION CORD. Extension cords that are too long or too light do not deliver sufficient
voltage to the pump motor. But, more important, they could present a safety hazard if the insulation
were to become damaged or the connection end were to fall into the sump.
2. Make sure the pump electrical supply circuit is equipped with fuses or circuit breakers of
proper capacity. A separate branch circuit is recommended, sized according to the "National
Electrical Code" for the current shown on the pump nameplate.
3. Testing for ground. As a safety measure, each electrical outlet should be checked for ground
using an Underwriters Laboratory Listed circuit analyzer which will indicate if the power, neutral and
ground wires are correctly connected to your outlet. If they are not, call a qualified licensed electrician.
4. For Added Safety. Pumping and other equipment with a 3-prong grounded plug must be connected
to a 3-prong grounded receptacle. For added safety the receptacle may be protected with a ground-
fault circuit interrupter. When a pump needs to be connected in a watertight junction box, the plug
can be removed and spliced to the supply cable with proper grounding. For added safety this circuit
may be protected by a ground-fault circuit interrupter. The complete installation must comply with
the National Electrical Code and all applicable local codes and ordinances.
5. FOR YOUR PROTECTION, ALWAYS DISCONNECT PUMP FROM ITS POWER SOURCE BEFORE
HANDLING. Single phase pumps are supplied with a 3-prong grounded plug to help protect you
against the possibility of electrical shock. DO NOT UNDER ANY CIRCUMSTANCES REMOVE
THE GROUND PIN. The 3-prong plug must be inserted into a mating 3-prong grounded receptacle.
If the installation does not have such a receptacle, it must be changed to the proper type, wired
and grounded in accordance with the National Electrical Code and all applicable local codes and
ordinances. Three phase pumps require motor starting devices with motor overload protection. See
FM0486 for duplex installations.
6. The tank is to be vented in accordance with local plumbing code. Pumps must be installed in
accordance with the National Electrical Code and all applicable local codes and ordinances. Pumps
are not to be installed in locations classified as hazardous in accordance with National Electrical
Code, ANSI/NFPA 70.
7. "Risk of electrical shock" Do not remove power supply cord and strain relief or connect conduit
directly to the pump.
8. Installation and servicing of electrical circuits and hardware should be performed by a qualified
licensed electrician.
9. Pump installation and servicing should be performed by a qualified person.
10. Risk of electric shock - These pumps have not been investigated for use in swimming pool and
marine areas.
11. According to the state of California (Prop 65), this product contains chemicals known to the state
of California to cause cancer and birth defects or other reproductive harm.
®
MAIL TO: P.O. BOX 16347 • Louisville, KY 40256-0347
SHIP TO: 3649 Cane Run Road • Louisville, KY 40211-1961
(502) 778-2731 • 1 (800) 928-PUMP • FAX (502) 774-3624
INSTALLATION INSTRUCTIONS
RECOMMENDED MODELS
EFFLUENT*/SUMP/DEWATERING
49 / 53 / 57 Series, 98 Series
137 Series, 151 / 152 / 153 Series
SEE BELOW FOR
LIST OF WARNINGS
© Copyright 2011 Zoeller Co. All rights reserved.
®
SEWAGE
264 Series
266 / 267 / 268 Series
1. Check to be sure your power source is capable of handling the voltage requirements of the motor,
as indicated on the pump name plate.
2. The installation of automatic pumps with variable level float switches or nonautomatic pumps using
auxiliary variable level float switches is the responsibility of the installing party and care should be
taken that the tethered float switch will not hang up on the pump apparatus or pit peculiarities and
is secured so that the pump will shut off. It is recommended to use rigid piping and fittings and the
pit be 18" or larger in diameter.
3. Information - vent hole purpose. It is necessary that all submersible sump, effluent, and sewage
pumps capable of handling various sizes of solid waste be of the bottom intake design to reduce
clogging and seal failures. If a check valve is incorporated in the installation, a vent hole (approx.
3/16") must be drilled in the discharge pipe below the check valve and pit cover to purge the unit
of trapped air. Trapped air is caused by agitation and/or a dry basin. Vent hole should be checked
periodically for clogging. The 53 / 57, and 98 Series pumps have a vent located in the pump housing
opposite the float, adjacent to a housing lug, but an additional vent hole is recommended. The vent
hole on a High Head application may cause too much turbulence. You may not want to drill one.
If you choose not to drill a vent hole, be sure the pump case and impeller is covered with liquid
before connecting the pipe to the check valve and no inlet carries air to the pump intake. NOTE:
THE HOLE MUST ALSO BE BELOW THE BASIN COVER AND CLEANED PERIODICALLY. Water
stream will be visible from this hole during pump run periods.
4. Pump should be checked frequently for debris and/or build up which may interfere with the float "on"
or "off" position. Repair and service should be performed by Zoeller Pump Company Authorized
Service Station only.
5. Dewatering and effluent sump pumps are not designed for use in pits handling raw sewage.
6. Maximum operating temperature for standard model pumps must not exceed 130°F (54°C).
7. Pump models 266, 267, 268, and 137 must be operated in an upright position. Do not attempt to
start pump when tilted or laying on its side.
8. Do not operate a pump in an application where the Total Dynamic Head is less than the minimum
Total Dynamic Head listed on the Pump Performance Curves.
NOTE: Pumps with the "UL" mark and pumps with the "US" mark are tested to UL Standard UL778.
CSA Certified pumps are certified to CSA Standard C22.2 No. 108.
1
visit our web site:
www.zoeller.com
DATE INSTALLED:
MODEL NUMBER:
SEE BELOW FOR
LIST OF CAUTIONS
REFER TO WARRANTY ON PAGE 2.
SECTION: 6.10.002
FM2676
1011
Supersedes
New

Publicidad

Tabla de contenido
loading

Resumen de contenidos para Zoeller 49 Serie

  • Página 1 If the installation does not have such a receptacle, it must be changed to the proper type, wired or “off” position. Repair and service should be performed by Zoeller Pump Company Authorized and grounded in accordance with the National Electrical Code and all applicable local codes and Service Station only.
  • Página 2 If the above checklist does not uncover the problem, consult the factory - Do not attempt to service or otherwise disassemble pump. Service must be performed by Zoeller Authorized Service Stations. Go to www.zoellerpumps.com/servicestations to find the Authorized Service Station in your area.
  • Página 3 & Dewatering only). pipe even with the top of the pump. NOTE: THE HOLE MUST ALSO (14) Install Zoeller Pump Stand (Model 10-2421) under pump to provide a BE BELOW THE BASIN COVER AND CLEANED PERIODICALLY. settling basin. (Effluent & Dewatering only.) (High Head unit see #3 under “Caution”...
  • Página 4 IMPORTANT NOTICE: Some insurance policies, both commercial and residential, extend coverage for damages incurred by product failure. You will need to have possession of the product to support your claim in most cases. Zoeller Pump Co. will exchange the unit or refund the original purchase price once the claim is settled with the insurer in the case where you need to retain possession of the product to support a damage claim you submit to your insurance company.
  • Página 5: Modelos Recomendados

    11. Este producto contiene sustancias químicas que de acuerdo al estado de California pueden causar cáncer y defectos congénitos u otros daños a la salud reproductiva. REFIÉRASE A LA GARANTÍA EN LA PÁGINA 2. © Copyright 2011 Zoeller Co. All rights reserved.
  • Página 6: Garantía Limitada

    Si la lista de verificación arriba mencionada no revela el problema, consulte con la fábrica. No intente proporcionar algún servicio o desarmar la bomba. Las Estaciones de servicio autorizadas por Zoeller deberán proporcionar dicho servicio. Visite el sitio www.zoellerpumps.com/servicestations para encontrar la estación de servicio autorizada para su zona.
  • Página 7: Instalación Recomendada Para Todas Las Aplicaciones

    4. Cuando instale un “Unicheck”, perfore un agujero de 5 mm (3/16 pulg.) de 14. Instale el soporte para bomba Zoeller (Modelo 10-2421) debajo de la bomba para diámetro en la tubería de descarga al mismo nivel de la parte superior de la proporcionar un sumidero de decantación (sólo para efluente y achique).
  • Página 8: Instrucciones Para La Instalación De Los Modelos Wd Y Wh

    AVISO IMPORTANTE: Ciertas pólizas de seguro, tanto comerciales como residenciales, extienden la cobertura a los daños causados por la falla del producto. En la mayoría de los casos, usted deberá conservar el producto para respaldar su reclamo. Zoeller Pump Co. reemplazará la unidad o reembolsará el precio de compra original una vez que la compañía de seguros liquide el reclamo, en el caso de que usted necesite conservar el producto para respaldar un reclamo...
  • Página 9 CSA sont vérifiées d’après la norme C22.2 no 108. la cause de cancer et de déficiences à la naissance ou autres dommages reproductifs. SE RÉFÉRER À LA GARANTIE EN PAGE 2. © Copyright 2011 Zoeller Co. All rights reserved.
  • Página 10: Garantie Limitée

    Si les vérifications ci-dessus ne résolvent le problème, consulter l’usine. Ne pas essayer de réparer ou de démonter la pompe. Toutes les réparations doivent être faites par un centre de réparation agréé par Zoeller. Visitez le site Web www.zoellerpumps.com/servicestations pour trouver le centre de service agréé...
  • Página 11 Il est possible de fabriquer les supports de flotteur en utilisant des tuyaux et des raccords standard pour faciliter la dépose en cas de réparation. Les supports de flottes sont disponible chez Zoeller tel que décrit au feuillet FM0526 ou peuvent être fabriqué avec de la tuyauterie et des raccords standard.
  • Página 12: Instructions De Branchement Monophasé

    REMARQUE IMPORTANTE. – Certaines polices d’assurance commerciales et résidentielles couvrent les dommages résultant d’une défaillance du produit. Dans la plupart des cas, vous devez être en possession du produit pour déposer une réclamation. Zoeller Pump Co. s’engage à remplacer l’appareil ou à rembourser le prix d’achat original après que l’assureur aura réglé la réclamation dans un cas où vous êtes tenu d’être en possession du produit pour documenter une réclamation soumise à...

Tabla de contenido