Descargar Imprimir esta página

Juliana Halls Popular Manual Del Usuario página 3

Publicidad

May we congratulate you on your new Greenhouse
GB
Dear Customer!
The assembly of your new greenhouse requires
no technical knowledge. However, it is important
that the assembly instructions are strictly followed.
The assembly instruction is a combination of text
and illustrations. The profiles are packed
separately in numbered packs corresponding to
the order in the assembly instruction. Erect one
pack at a time. All nuts bolts and fittings are
found in bag No. 0 (specified on page 12).
Each pack is specified in separate lists of
components.
All detailed illustrations are marked with symbols:
Seen from inside
Seen from outside
Precautions.
• Assembly must be carried out in dry, calm
weather.
• Always use working gloves while glazing.
Greenhouse glass has sharp edges,
especially if it breaks.
• Assistants and especially children must be
warned broken glass is an element of
danger. Pick up broken glass at once and
remove with care.
• We recommend to use protective glasses
while fixing spring wire glazing clips.
• Place the ladder on a level support.
• It is essential to have an assistant.
References.
The column marked
indicates the page(s)
on which the component is used.
Tools
The mounting of the greenhouse requires the tools
shown on page 12.
Page 13:
Foundation
If you are not using the pre-fabricated base for this
greenhouse, you must have an alternative base
to raise the frame off the ground, otherwise the
door will not run correctly. If you are making your
own base, the measurements indicated must be
external measurements. We recommend 19mm
x 32mm pressure treated timber for DIY base,
also for wall
battens.
For the pre-fabricated base, you furthermore need
about 75 litres of concrete and 4 or 6 (depending on
the size of greenhouse) plastic concrete pipes of
about 800mm which are placed in a non-
freezing depth for the fastening of the corner and/
or middle anchors.
The base must be 100% level and square; the
latter is ensured by checking the two
diagonal measurements are equal.
The base must be 100% level and square; the latter
is ensured by checking the two diagonal
measurements are equal. For the pre-fabricated
base on a solid foundation i.e. concrete pad, slabs or
sleppers, the ground anchors will need to be cut to
the height of the base with a hack saw as they are
also corner brackets. (A)
Pages 15-32:
Place the components as shown on the illustration
and assemble in the order shown in the pictures. Do
not tighten the nuts completely until the front gable
construction has been assembled.
Fitting of glass/polycarbonate
Important before glazing!
Make sure that the gables and sides are level and
square, and that the door(s) and window(s) are
functioning perfectly.
Best order of assembly:
1) Rear gable – 2) Front gable – 3) Sides –
4) Frame assembly – 5) Roof and bracing
6) Doors – 7) Vents – 8) Glazing
Remember to insert extra bolts in profiles 1711 to fit
08615 and 299. Note 299 is only required in the
106 Popular.
Pages 27-30:
Glazing
Fit glazing strip (411) to all glazing bars, gable
bars and corner posts (vertical bars) before you
begin to glaze the greenhouse.
Start glazing the roof first (working from the bottom
up for horticultural glass), one pane at a time.
Spring wire clips and glass holder clips are to be fitted
as shown.
X = Spring wire clips, > = Glass holder clips
Page 31:
Mounting of Polycarbonate
The illustrations on page 31 show where to mount
them. The type indication states the length in mm. A
possible adjustment is made by means of a fine-
tooth saw.
NB! To avoid the formation of algae the
polycarbonate sheets must not come into contact
with the ground. Rest them on a piece of cardboard.
J, K, L, M – lists are mounted as shown on page 31.
www.hallsgreenhouses.com
Please refer to website for the most up to date instructions.
USA
Sealing of the polycarbonate sheets
The sheets may be sealed against insects. Close
the top-end off with alu-tape (NOT SUPPLIED) or
silicone (NOT SUPPLIED).
The bottom only with airstrip tape (NOT SUPPLIED)
to let condensation out.
Now your greenhouse is completely assembled.
However, please notice the following:
Maintenance
• Grease doors (hinges and lock or door track).
• Clean the gutter for leaves, etc.
• Adjustment of windows.
• Replacement of broken glass.
• Clean the greenhouse with disinfectant
before and after the growing season.
Winter Protection
In areas with occurrence of snow we recommend
the following winter protection.
• Support the roof ridge at the centre of the
greenhouse.
• Remove greater snow loads from the roof.
• Take precautions against snow falling down
from a tree for instance, or a roof.
• Dismount the cylinders for the automatic
window openers, if any (optional extras).
• Secure door(s) and window(s) preventing
wind damage to the greenhouse.
Insurance
Please note that not all insurance companies cover
greenhouses automatically. Please contact your
insurance company to ensure an insurance
coverage.
Guarantee
The greenhouse frame only, has a guarantee of 12
years which covers replacement of faulty
components.
The guarantee does not cover glass,
polycarbonate, assembly, freight etc.
There is a 2 year guarantee on painted parts, if any.
Note that marks in the painting may occur due to
suspension of the profiles.
The guarantee is invalid if the greenhouse is not
assembled according to these instructions.
Complaints
All our greenhouses are built to high standards of
quality. However, should a complaint occur,
please contact your dealer at once. Remember to
specify the defect by indicating the greenhouse
model and number of the component.

Publicidad

loading

Este manual también es adecuado para:

So0200So81117093770938