Descargar Imprimir esta página

Cebora MIG3240/T Manual De Instrucciones página 15

Publicidad

Idiomas disponibles

Idiomas disponibles

CEBORA S.p.A.
5
MAINTENANCE.
5.1
Periodic inspection, cleaning.
Periodically make sure that the Welding System equipment and all connections are in proper condition to
ensure operator safety.
Periodically open the panels of the Power Source to check the internal parts. Periodically remove dirt or
dust from the internal parts, using a jet of low-pressure dry compressed air or a brush.
Check the condition of the internal power connections and connectors on the electronic boards; if you
find "loose" connections, tighten or replace the connectors.
To ensure proper air flow and thus adequate cooling of the internal parts of the Power Source,
periodically open the grids on the Power Source and check the interior of the aeration tunnel.
Remove dirt or dust from the internal parts of the tunnel, using a jet of low-pressure dry compressed air or
a brush.
Check the condition of the electrical connectors, the power cable and the pneumatic fittings; replace if
damaged.
After making a repair, be careful to arrange the wiring in such a way that the parts connected to the power
supply are safely insulated from the parts connected to the welding circuit.
Do not allow wires to come into contact with moving parts or those that heat up during operation.
Mount the clamps as on the original machine to prevent, if a conductor accidentally breaks or becomes
disconnected, a connection from occurring between power supply and the welding circuits.
5.2
Error Code.
The following table lists the "Error Codes" that may be visualized on displays O and P of the Control
Panel, in case of Welding System malfunction.
For a more detailed description of the troubleshooting refer to the Power Source Service Manual.
3.300.208-A
fig. 4
15
GB
04-03-2016

Publicidad

loading

Este manual también es adecuado para:

295.80Sound robot mig 2035/md double pulse300.80