Installing Supply Lines To The Compressor Unit (Spx1200T Only); Fixing The Cover Frame - Dometic RTX 1000 Instrucciones De Montaje

Ocultar thumbs Ver también para RTX 1000:
Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 47
Installation
6.8
Installing supply lines to the compressor unit
(SPX1200T only)
Observe the following instructions when installing the supply lines:
• Also observe the installation instructions for the compressor unit.
• The maximum cable length between the evaporator and compressor unit is
4.20 m (fig. e).
• When installing and bending supply lines, avoid narrow radii. Use a suitable
round object as a bending aid. A radius which is too narrow will buckle the
refrigerant line, and the parking cooler will be inoperable.
➤ Shorten any supply line which is not needed by bending a curve.
➤ Apply packing compound (fig. e 1) to prevent water entering between the
rear wall of the truck and the clip.
I
NOTE
If you wish to avoid damaging the rear wall of the truck (drilling a hole), you can
also apply the clip using a suitable adhesive. Observe the instructions provided
by the adhesive manufacturer.
➤ Fasten the supply lines to the rear wall of the truck using the clips provided
(fig. e).
➤ Insert the corrugated piping in the holder provided (fig. e 2).
➤ Put the cover on (fig. e 4).
6.9

Fixing the cover frame

A
NOTICE!
Tighten the screws carefully in order not to damage the cover frame.
➤ Fix the cover frame in place as illustrated (RTX: fig. c, SPX: fig. d).
12
RTX1000/2000, SPX1200T
EN

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Rtx 2000Spx 1200t

Tabla de contenido