Installation Instructions - Presto SQUALE II 56000 Manual Del Usuario

Robinet électronique
Tabla de contenido

Publicidad

ENGLISH

1) INSTALLATION INSTRUCTIONS

2) SQUALE II electronic valve
3) PRECAUTIONS FOR USE (The product guarantee depends on the respect for these rules)
INSTALLATION and START UP
For products delivered with filters, these must be installed in accordance with the instructions.
Before commissioning any of our valves, it is essential to carefully drain
the pipes that can damage the mechanisms or water passages (PRESTO® heads that can be dismantled from front).
Recommended operating pressure according to NF EN 816: 1 to 5 bars.
CLEANING
The chrome-plated coating of PRESTO® valves must be cleaned only with soapy water.
Abrasive, acid, alkaline or ammonia-based household products are prohibited.
4) Mixing valve
5) Mixing valve without lever
6) Single
7) CRP2 6V DC lithium battery powered
8) Secured power supply 230V/7V – 2.1W
9) Regular rinsing
10) Signalling sticker
11) Hoses female nuts 3/8" L 350 mm
12) PEX hoses female nuts 3/8" L 350 mm
13) NC non-return
14) Limiting aerator 6 l/min
15) Laminar spout 8 l/min
16) Straight shut-off valve MM G3/8"
17) Filter angle shut-off valve MM G3/8"
18) Flat filter seal
19) Commissioning
20) Filter shut-off valve
21) ! Filter seal
22) Straight shut-off valve
23) Flow curve
24) Flow rate (l/min)
25) Laminar spout
26) Aerator
27) Bar
28) AUTO
29) 230 V AC power supply through minimum 2 x 0.5 mm² cable. 6 to 8.5 mm diameter.
The installation must comply with the current standards in your country. Disconnect the power supply before any intervention on
the valve. The transformer is equipped with an overload thermal protection. When it is operating, it is necessary to switch off the
electrical supply for 30 seconds to reset it, after having eliminated the cause of the fault.
30) Attachment: 2 screws Ø 4.5 max
31) Top
32) Bottom
33) Recommended operating pressure: 0.1 MPa (1bar) to 0.5 MPa (5bars).
Limit operating pressure: 0.05 MPa (0.5 bars) to 0.8 MPa (8bars).
34) Mixing valve/ hot water stop adjustment
35) Delivery position for use on hot water temperature 40° C
36) Anti-burn 40° C temperature limitations stop. To obtain water at 40° C in "hot" position, place t he notched stop as follows
depending on the hot water temperature. (For cold water 15° C and balanced pressures).
37) Hot water inlet temperature
38) Reassembly
39) Models with regular rinsing
A flow of 30 seconds is carried out 72 hours after last use, then every 72 hours, in order to prevent water stagnation and reduce
the risk of legionella.
40) MAINTENANCE
41) Replacing the battery part no. 90941
42 WORN-OUT BATTERY
43) LED flashing constantly, out of order
44) Lithium battery 6V CRP2 Part no. 90941
45) Replacing the solenoid valve part no. 90944
46) Disassembly
47) ! Seal
48) Solenoid valve Part no. 90944
49) Replacing the seal
50) Replacing the circuit
51) Battery circuit part no. 90942
52) Mains circuit Part no. 90943
53) This document is not contractual; we reserve the right to modify the characteristics of our products without notice.
54) PATENTED and REGISTERED MODELS
55) Adjust the tightening torque to the material base and exceed by no means the limitation of 10N-m

Publicidad

Tabla de contenido
loading

Tabla de contenido