support@nextlevelracing.com
OUTSIDE VIEW
(
)
PRE-DRILLED HOLE
(
)
LEFT
(
)
PRE-DRILLED HOLE
(
)
RIGHT
13
Install 3 x T-Nuts into the top channel and 1 x T-Nut into the outside channel of both the Left Pedal Arm
and the Right Pedal Arm.
Note: For Shorter Users Please Skip
to STEPS 15 & 16.
14
Align the through holes on the Pedal Arms with the holes on the Wheel Post Connection Plates. Bolt
through and secure with 2 x M8 Bolts, Washers, Square Washers and Flange Nuts.
ALTERNATE PEDAL INSTALLATION
(
)
FOR SHORTER USERS
(
PRE-DRILLED HOLE
(
PRE-DRILLED HOLE
)
(
)
RIGHT
15
Install 1 x T-Nut into the outside channel of each Pedal Arms.
PARTS:
TOP VIEW
• • 8 x T-Nuts
• • Right and Left Pedal Arms
PARTS:
• • 2 x M8 60mm Bolts
• • 2 x M8 Washers
• • 2 x M8 Flange Nuts
Repeat
on Other
Side
• • 2 x Square Washers
PARTS:
• • 2 x T-Nuts
)
(
)
LEFT
• • Right and Left Pedal Arms
14
ALTERNATE PEDAL INSTALLATION
(
)
FOR SHORTER USERS
16
Align the hole on the Wheel Post Connection Plate with the T-Nuts previously installed in Step 15. Bolt
through and secure with M8 Bolt and Washer. Repeat on the other side.
Note: Do not tighten the
Pedal Plate until you achieve
the desired position.
)
A
17
A) Align the Large Pedal Plate with the T-Nuts previously installed in Step 13.
B) Bolt through and secure with M8 Bolts and Washers.
Note: Use laser lines for
easy alignment.
)
A
18
A) Align the Small Pedal Plate with the T-Nuts previously installed in Step 13.
B) Bolt through and secure using M8 Bolts and Washers.
Video Instruction: bit.ly/nlrbuild
PARTS:
Repeat
• • 2 x M8 20mm Bolts
on Other
Side
• • 2 x M8 Washers
PARTS:
Repeat
• • 4 x M8 16mm Bolts
on Other
Side
• • 4 x M8 Washers
• • 1 x Large Pedal Plate
)
B
PARTS:
Repeat
• • 2 x M8 16mm Bolts
on Other
Side
• • 2 x M8 Washers
• • 1 x Small Pedal Plate
)
B
15