Connection; Standlight - Busch+Müller IQ-X Instrucciones De Uso

Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 58

6.4. Connection

Two double cables of different lengths are mounted in the headlight
hub dynamo (shorten if necessary), and the short cable (with plugs) with the rear light. For this purpose,
tilt the headlight
1
with the enclosed double cable.
If you do not use the rear light cables, the plugs should be insulated in order to prevent malfunction.
NOTICE
Always ensure correct polarity.
Black wire = current / white/black wire = mass.
NOTICE
Cables on the headlight
for use with hub dynamos, not for side running dynamos.

7. Standlight

The standlight function is always ready for operation, entirely maintenance-free, and it works without
batteries or accumulators.
While cycling, a small amount of the energy supplied by the dynamo is stored in a capacitor. After about
3 minutes of cycling, the capacitor is fully charged. When stationary, this stored energy supplies power
to the headlight LED, the LEDs in the lateral light slots and the blue indicator LED in the rear button of
the headlight
They keep on shining. The standlight can be switched off prematurely by pressing the
1
button on the rear side of the headlight
26
forward, if necessary, and either use the existing cable on the bike or connect it
must never be cut off completely. The headlight
1
1
.
1
Connect the long cable with the
is only suitable
1

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

168

Tabla de contenido