INSTALLATION INSTRUCTIONS
The switch is correctly installed at
this point. It is now only possible
to close the hatch completely
after having raised the lever to
position "I" (Fig. 3).
When you use the device for the
first time, make the switch trip
using the insulating ferrule
supplied with the device in
automatic mode. Operate the drive
pin slot on the side of the switch
(Fig. 4) and check the entire reset
cycle.
If the reset cycle does not end
correctly, check the system's earth
insulation, which should be over
500 kΩ and the load impedance
which should be over 1.2 Ω.
I
I
I
22
GW90991
R
S
E
TART
230V~
INSERIRE CON
ON
LEVA IN
OFF
I
POSIZIONE I
GW90991
R
S
E
TART
230V~
TEST
INSERIRE CON
ON
LEVA IN
OFF
I
POSIZIONE I
Fig. 3
Fig. 4