Transport, storage and unloading
2.1
Transport
The system must be secured to prevent shifting and falling during transport. It must be ensured that the
tensioning belts used for securing during transport remain undamaged.
Stress caused by impacts must be avoided at all costs. Under no circumstances should the system be
lifted by the piping or rolled or dragged over the ground.
2.2
Storage
Any necessary intermediate storage of the system must be on a suitable, level surface. During storage,
damage caused by environmental or external factors must be avoided. The rain cover fitted on delivery
must be left on the tank housing when stored outdoors. This only serves as rain protection or as transport
packaging and cannot be walked on and is not childproof. Before installation, the rain cover must be re-
placed with a suitable cover (telescope with a suitable cover)!
Storage outdoors should not be for any longer than one year. What is more, the impact sensitivity of the
elements increases as the temperature falls. Especially in the event of frost, impact may therefore cause
damage to the elements.
2.3
Unloading
The system can be transported to the installation site with a forklift truck or similar equipment using the
crane eyes provided. Under no circumstances should the system be lifted by the piping.
At the installation site, the GRAF EcoPure 200 can be moved with a lightweight device.
2. Transport, storage and unloading
Before installation, check the EcoPure 200 system and its accessories for
completeness and damage. Damaged or defective parts must not be used.
If in any doubt, please contact GRAF.
/