∙ Open the main tap (A).
5.2
Draining the product
1
Key
1
Heat pump circuit air bleed valve
2
Heating circuit air bleed valve
∙ Open the air bleed valve (1) while fi lling the heat pump
circuit.
∙ Open the air bleed valve (2) while fi lling the heating
circuit with water.
∙ Close the vent as soon as water fl ows (repeat the
operation several times if necessary).
b
Caution!
Risk of damage in case of bad purge!
If air purging is not done properly, this may
cause damage to the appliance.
Make sure the system is properly purged
•
air.
5.3
Installing the casing
1
2
Key
1
Front casing
∙ Put the front casing back on.
5.4
Available head for heat pump circuit
A
Key
A
Installation heating circuit inlet
B
Installation heating circuit outlet
A
800
700
600
500
400
300
200
1
100
0
500
1000
Key
A
Pressure (mbar)
B
Flow rate (l/hour)
1
Position "III"
2
Position "II"
3
Position "I"
START UP
B
3
2
1500 2000 2500 3000
EN
B
10