Descargar Imprimir esta página

Mitsubishi Electric CITY MULTI PUMY-P112 Manual De Instalación página 13

Ocultar thumbs Ver también para CITY MULTI PUMY-P112:

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 70
6. Electrical work
<Permissible Lengths>
1 M-NET Remote controller
• Max length via outdoor units:
L
1
• Max transmission cable length: L
1
• Remote controller cable length: ℓ
1
If the length exceeds 10 m, use a 1.25 mm
maximum length and overall length.
2 MA Remote controller
• Max length via outdoor unit (M-NET cable): L
• Max transmission cable length (M-NET cable): L
• Remote controller cable length: m
1
M-NET Remote Controller
OC
(51)
(01)
TB3
TB7
TB5
C or D
M1 M2 S M1 M2 S
M1 M2 S
L
2
A B
(101)
RC
L
3
OC
(53)
(03)
TB7
L
6
TB5
TB3
C or D
M1 M2 S
M1 M2 S
M1 M2
S
Power Supply
Unit
M1 M2 S
TB7
System
controller
M1 M2
S
M1 M2 S
Fig. 6-2
A : Group
B : Group
C : Group
D : Shielded Wire
E : Sub Remote Controller
F : Screw on the electrical component box
( ): Address
<Example of Transmission Cable Wiring: When Using a Branch Box>
OC
(51)
L
TB3
1
TB7
M1 M2 S M1 M2 S
L
3
L
2
OC
(53)
TB7
L
4
TB3
M1 M2
S
M1 M2 S
Power Supply
Unit
M1 M2 S
DC24V
L
5
System
controller
M1 M2 S
G : Shielded wire
( ) : Address example
Fig. 6-4
+L
+L
+L
and L
+L
+L
+L
and L
+L
2
3
4
1
2
3
5
1
and L
+L
and L
+L
and L
and L
+L
3
4
3
5
6
2
, ℓ
, ℓ
+ℓ
, ℓ
10 m (0.5 to 1.25 mm
2
2
2
3
4
+L
+L
+L
and L
+L
+L
+L
1
2
3
4
1
2
6
and L
+L
and L
and L
1
3
4
6
and m
+m
+m
and m
+m
+m
+m
1
2
3
1
2
3
4
L
1
IC
IC
IC
IC
(02)
(05)
(06)
TB5
TB5
TB5
M1 M2 S
M1 M2 S
M1 M2 S
3
A B
A B
(105)
(155)
RC
RC
L
4
IC
IC
IC
(04)
(07)
TB5
TB5
M1 M2 S
M1 M2 S
A B
(104)
RC
TB3A
TB3A
TB15
Branch Box
1
S1
S1
IC
2
S2
S2
(01)
S3
S3
TB5
TB3B
TB3A
TB15
S1
1
M1
S1
IC
S2
2
M2
S2
(02)
S3
S3
S
TB3C
TB15
TB3A
S1
S1
1
IC
S2
2
S2
(03)
S3
S3
(01)
TB3D
TB3A
S1
S1
IC
S2
S2
(04)
S3
S3
TB3E
TB3A
S1
S1
IC
S2
S2
(05)
S3
S3
TB3A
TB3A
Branch Box
TB15
S1
S1
1
IC
S2
S2
2
(06)
S3
S3
TB5
TB3B
TB3A
(06)
M1
S1
S1
IC
S2
S2
M2
(07)
S3
S3
S
TB3C
TB3A
S1
S1
IC
S2
S2
(08)
S3
S3
+L
+L
500 m (1.25 mm
2
or more)
2
6
7
2
and L
200 m (1.25 mm
or more)
6
7
)
2
shielded wire. The length of this section (L8) should be included in the calculation of the
2
500 m (1.25 mm
or more)
7
+L
and L
200 m (1.25 mm
2
or more)
2
6
7
200 m (0.3 to 1.25 mm
2
)
MA Remote Controller
OC
(51)
TB7
TB3
C or D
M1 M2 S M1 M2 S
L
2
OC
(53)
TB7
TB3
M1 M2 S
M1 M2 S
L
6
Power Supply
Unit
M1 M2 S
System
controller
M1 M2 S
A : Group
B : Group
C : Group
D : Shielded Wire
E : Sub Remote Controller
F : Screw on the electrical component box
( ): Address
<Permissible Lengths>
A
Max length via outdoor units (M-NET cable):
MA
B
L
+ L
+ L
+ L
+ L
1
2
3
4
5
Max transmission cable length (M-NET cable):
A
MA
B
L
+ L
, L
, L
+ L
, L
1
2
3
3
4
5
A
MA
B
RC
RC
A
MA
B
RC
RC
L
1
IC
IC
IC
m
2
(01)
(02)
(05)
TB5
TB5
TB5
TB15
TB15
M1 M2 S
M1 M2 S
M1 M2 S
1 2
1 2
A B
MA
L
L
3
4
IC
IC
IC
(03)
(04)
(07)
TB5
TB15
TB5
TB15
TB5
C or D
M1 M2 S
M1 M2 S
M1 M2 S
1 2
1 2
TB7
A B
MA
M1 M2
S
Fig. 6-3
2
500 m (1.25 mm
or more)
200 m (1.25 mm
2
or more)
IC
m
2
(06)
TB5
TB15
TB15
M1 M2 S
1 2
1 2
m
4
A B
A B
MA
MA
TB15
1 2
13

Publicidad

loading