Descargar Imprimir esta página

Johnson AEROTERMIA AURUM R32 Serie Manual De Instrucciones página 102

Publicidad

Idiomas disponibles

Idiomas disponibles

15
Auto air purge valve
1. Installation Preparation
1.1 Install The Required Tools (Self-Provided)
Number
1
2
Electric Hammer
3
Adjustable Wrench
4
Needle-nose Plier
5
6
7
Torque Wrench
8
Hexagonal Wrench
9
1.2 Connecting Wires, Insulation Materials, PP-R Pipe, And Connector
a) The material and thickness of the insulation pipe meet the specified requirements.
Otherwise, heat loss and condensation will be caused.
b) Please refer to this manual's "Electrical Installation" description section for wire size selection.
Model
AURUM80M
AURUM100M
AURUM160M
AURUM200T
AURUM260T
1.3 Other Installation Materials
a)
Fix the pipe bracket and pipe clamp of the connecting pipe
b)
Wire threading pipe and pipe clamp
c)
Insulting tape, raw tape
d)
Expansion bolt
e)
Mounting bracket
2. Heat Pump Installation
2.1 The machine installation space meets the following schematic requirements to ensure
regular air circulation and maintenance;
2.2 The location of the machine should be kept away from heat, steam, or flammable gases;
Installation
Tool
Level
Impulse Drill
Ruler
Hammer
30
High pressure switch
Number
10
11
12
13
14
15
PP-R Tube Heat Melting Device
16
17
18
The water inlet/outlet size
DN25 (1'')
DN25 (1'')
DN32 (1-1/4'')
DN40 (1.5'')
DN40 (1.5'')
35
Tool
Saw
Flat Blade Screwdriver
Cross Screwdriver
Copper Tube Knife
PP-R Tube Knife
Compound Gauge
Vacuum Pump
Electronic Balance
V.1

Publicidad

loading

Este manual también es adecuado para:

Aerotermia aurum80mAerotermia aurum100mAerotermia aurum160m