Screen 10.12
Charging Start T. Start time for the Economy
mode charge profile.
Screen 10.13
Charging End T. End time for the Economy
mode charge profile.
Screen 10.14
Charge P. Lim. Battery charge power limit for
Economy mode.
Screen 10.15
Disch. Start T. for the Economy mode discharge
profile.
Screen 10.16
Disch. End T. for the Economy mode discharge
profile.
Screen 10.17
Disch. P. Lim. Battery discharge power limit for
Economy mode.
Screen 10.18
Output unlocked
Screen 10.18.1. OFF. The generation is distributed equally
among the 3 phases.
Screen 10.18.2 ON. It allows the generation to be
distributed independently between the phases based on
their consumption.
After changing the work mode, this option must
be confirmed.
Screen 10.19
Maintenance. System maintenance, includes
stop and start of the inverter, restart of the system.
Screen 10.20
Pass. sett. Password setting: Parameter
to set the password for accessing the menu or advanced
configuration.
7.2. TRANSFORMATION RATIO
CONFIGURATION.
This parameter is set automatically when the meter is detected.
To set it manually, follow these steps on the inverter display:
Main configuration.
•
CT Ratio: Set the value 90:1 for the CT supplied with the
•
inverter.
7.3. ZERO INJECTION FUNCTION.
The "Zero injection" function prevents the energy generated by
the inverter that is not consumed in the same installation from
being fed into the grid. In other words, it reduces the power of
the inverter so that the generation is adapted to the consumption.
To activate the function, follow these steps on the inverter display:
General configuration → Power limit → make sure that it is
•
set to "ON".
This parameter enables the reading of the CT transformer.
If this parameter is not enabled, even if the CT is connected,
the inverter will not read its signals.
General configuration→ Export → Change from 100% to 0%,
•
so as not to dump the surpluses into the grid.
Once the "Zero injection" is configured, the inverter will limit its
power to match it at all times to the consumption of the installation
and not inject excess energy into the grid.
The meter and the CT transformers must be installed and
connected, according to section .
USER MANUAL
7.4. GUIDE TO CONFIGURE THE INVERTER
USING THE BLUETOOTH APP.
To configure the inverter via the display, see the next
section.
Link to download the Bluetooth app:
https://play.google.com/store/
apps/details?id=stems.stools.
app&hl=es&gl=US
https://apps.apple.com/es/app/
stools/id1616378966?l=ca
Download the STools app and install it on the smartphone or
tablet of the installer of the EQUINOX2 solar inverter.
This process can take a few minutes. Once complete, open the
STools app. Bluetooth communications must be enabled on the
smartphone or tablet.
Make sure the hybrid's bluetooth communications are
1.
enabled. To do so, follow the steps of common FAQ (Tab. 11)
number 8.
A home screen will appear as shown below:
2.
Pair with the inverter using the SCAN button and identify
3.
the inverter from the list of bluetooth devices that appear.
The inverter will appear as "BLE-AP" followed by 8 characters
that correspond to the last 8 characters of the serial number.
EQX2 SOLAR INVERTERS CONNECTED TO THE GRID
87