Boiler Installation; Installer's-User's Manual - Beretta EXCLUSIVE GREEN HE C.S.I. Serie Manual Del Instalador Y Del Usuario

Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 29
EXCLUSIVE GREEN HE C.S.I. - R.S.I.
EN
ENGLISH
1 - GENERAL SAFETY DEVICES
The boilers produced in our factory are built with care down to the last
component to protect both the user and installer from eventual accidents.
We therefore recommend qualifi ed personnel that after working on the
product they should pay particular attention to the wiring, especially the
bare wires, that must not be exposed outside the terminal board for any
rason to prevent any contact with the live parts of the wiring.
This instructions manual is integral parts of the product. Make sure they
remain with the boiler, even if it is transferred to another owner or user
or moved to another heating system. In case of loss or damage, please
contact your local Technical Assistance Service for a new copy.
This boiler may only be installed and serviced by qualifi ed fi tters who
satisfy the requirements of local rules. Work must be done in compliance
with regulations in force and subsequent updates.
The boiler must be serviced at least once a year. This should be booked
in advance with the Technical Assistance Service.
The installer shall instruct the user in the operation of the boiler and the
safety devices.
This boiler may only be used for what it was expressly built to do. The
manufacturer declines all contractual and non-contractual liability for injury
to persons or animals or damage to property deriving from errors made
during installation, adjustment and servicing and from improper use.
This appliance is used to produce hot water and must therefore be
connected to a heating and/or a domestic hot water system, according
to its performance and power.
After removing the packaging, make sure the contents are undamaged
and complete. If this is not the case, contact your dealer.
When the product reaches the end of its life it should not be disposed
of as solid urban waste but should be brought to a separated waste
collection facility.
The safety valve outlet must be connected to a suitable collection and
venting system. The manufacturer declines all liability for any damage
caused by the safety valve.
The safety and automatic adjustment devices on the appliance must
never be modifi ed during its lifetime, except by the maker or dealer.
If the appliance develops a fault and/or works badly, switch it off and do
not attempt to repair it yourself.
Immediately after installation, inform the user that:
- in the event of leaks, he/she must shut off the water supply and
promptly inform the Technical Assistance Service
- GREEN HE C.S.I.: he/she must check from time to time to make sure
the
symbol is not lit on the control panel. This symbol means that
the pressure in the water system is incorrect. If necessary, fi ll the
system as described in the paragraph "Boiler functions"
- GREEN HE R.S.I.: must periodically check, on the display, that the
pressure value is between 1 and 1,5 bar; if not fi ll the system as
described in the paragraph "Boiler functions"
-
if the boiler is not planned to be used for a long period, he/she
should call in the Technical Assistance Service to perform the following
operations:
- turn off the main boiler and general system switches
- close the gas and water taps on both the heating (GREEN HE
C.S.I.-GREEN HE R.S.I.) and domestic hot water circuits (GREEN
HE C.S.I. only)
- drain the heating (GREEN HE C.S.I.-GREEN R.S.I.) and domestic
hot water (GREEN HE C.S.I. only) circuits to prevent freezing.
Connect the outlet collector to a suitable outlet system (refer to chapter 5).
Safety measures:
the boiler should not be used by children or unassisted disabled people
electrical devices or equipment, such as switches, appliances, etc.,
should not be used if there is a smell of gas or fumes. If there is a gas
leak, open all the doors and windows to ventilate the area, turn off the
general gas tap and immediately call the Technical Assistance Service
do not touch the boiler barefoot or if parts of your body are wet or damp
press the
button until "- -" is shown on the display and disconnect the
electricity supply by turning off the two-position system switch, before
cleaning
it is forbidden to modify the safety or adjustment devices without the
manufacturer's permission and relative instructions
The following symbols are used in this manual:
CAUTION = operations requiring special care and adequate prepa-
ration
NOT ALLOWED = operations that MUST NOT be performed
R.S.I.: DHW functions refer only if a water tank is connected (accessory
available on request).
4
do not pull, detach or twist the wires from the boiler even if they are not
connected to the power supply
do not block or reduce the size of the ventilation openings in the room
do not leave infl ammable containers or substances in the room
keep packaging out of reach of children
only use appliance for purposes it is devoted to
do not lean any object on the boiler
do not tamper with sealed elements
it is forbidden to block the condensate outlet.

2 - BOILER INSTALLATION

Boiler must only be installed by qualifi ed personnel.
Boiler is available in the following models:
Model
Type
C.S.I.
combined
R.S.I.
CH only
Exclusive GREEN HE C.S.I. is a C-type condensation wall-mounted boi-
ler for heating and producing domestic hot water; Exclusive GREEN HE
R.S.I. is a C-type condensation wall-mounted boiler and is able to operate
in different conditions:
- CASE A: only heating. The boiler doesn't supply domestic hot water
- CASE B: only heating with water tank connected, managed by a thermo-
stat, to prepare domestic hot water
- CASE C: only heating with water tank connected (kit available upon re-
quest), managed by a temperature sensor, to prepare domestic hot water.
Connecting a water tank not supplied by us, please be sure that the NTC
sensor ised has the following features: 10 kOhm at 25°C, B 3435 ±1%.
Depending on the type of installation selected, it is necessary to set the pa-
rameter "domestic hot water mode". Refer to specifi c chapter for description
and setting parameter operations.
Exclusive Green HE boilers are fi tted with:
- circulation at adjustable speed (PWM = Pulse-Width Modulation)
- 1- 10 modulation, the boiler is designed to automatically modulate the fl ow
rate supplied between a maximum and a minimum (see technical data)
- Range Rated, indicates that the boiler has a device for adapting to the
system's heat requirements, making it possible to adjust the boiler's fl ow
rate to the energy requirements of the building
The following types of fumes outlet are available for this kind of boiler:
B23P; B53P; C13,C13x; C23; C33,C33x; C43,C43x; C53,C53x; C63,C63x;
C83,C83x, C93,C93x.
In B23P confi guration (if installed inside), do not install the apparatus in
rooms used as bedrooms, bathrooms, showers or where there are open
vent stacks without own air exchange. The boiler must be installed in an
adequately ventilated room. See the UNI-CIG 7129-7131 and UNI 11071
standards for detailed instructions on installing vent stacks, gas pipes and
to ventilate the room.
In C confi guration the boiler can be installed in any type of room and there
are no limits to aeration conditions and size of room.
For proper installation, we remind you that:
- the boiler must not be installed over a kitchen or any other cooking equi-
pment
- minimum spaces are to be left in order to allow maintenance operations:
at least 5,0 cm every side and 20 cm under the boiler
- it is forbidden to leave infl ammable substances in the room
- suitably insulate heat-sensitive walls (e.g.: in wood).
Support plate and integrated pre-installation template are provided for with
the boiler (Fig. 1.1).
Mounting instructions:
- fi x the boiler support plate (F) with the template (G) to the wall and use a
plumb to check that it is perfectly horizontal
- trace out 4 holes (Ø 6 mm) for fi xing the boiler support plate (F) and 2
holes (Ø 4 mm) for fi xing the pre-installation template (G)
- make sure all the measurements are correct, then drill holes in the wall
using a drill and point with the diameter given previously
- fi x the plate to the wall by the supplied anchor screws
- make hydraulic connections.
After installing the boiler, the screws D1 (Fig. 1.2) can be removed. After
installing the boiler and connecting it to the water and gas supplies, fi t the
lower cover (A-B, Fig. 1.3) so that its hooks slip into the relative slots in the
lower part of the boiler. Fix the lower cover with the screw C (Fig. 1.4) con-
tained in the documentation envelope in the boiler.
Category
Power
C
25-35 kW
C
25-35 kW

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Exclusive green he r.s.i. serieExclusive green he 25 c.s.i.Exclusive green he 35 c.s.i.Exclusive green he 25 r.s.i.Exclusive green he 35 r.s.i.

Tabla de contenido