Descargar Imprimir esta página

PERMASTEEL PO-40001-BK Guía De Uso Y Cuidado página 16

Publicidad

Idiomas disponibles

Idiomas disponibles

Final Installation Check List
Maintain specified clearance of 36 inches from combustible materials and
construction.
All internal packaging has been removed.
The hose and regulator are properly connected to the Liquid Propane cylinder.
The unit has been tested and is free of leaks.
The gas supply shutoff valve has been located.
The burner is installed properly.
Keep the instruction manual for future reference.
16

Publicidad

loading

Este manual también es adecuado para:

Po-40001-cbk