Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

Depending on the composition of the wall, special wall dowels may have to be used
(to be provided by the customer).
Fig. A: Water connection from above
Fig. B: Water connection from rear
11.1 Only when the water connection is from the rear: Install the connection bracket (a)
leaktight.
11.2 Screw in the water volume regulators (b) leak-tight.
11.3 Align the water volume regulator in such a way that the screw plug and the operating
element are freely accessible.
11.4 For a shower head height of 2.10 m to 2.30 m, mark drill holes for installation at a
height (c) of 2.14 m to 2.34 m from the upper edge of the prefabricated foot base.
11.5 Drill according to the markings.
11.6 Insert the dowels.
11.7 Screw on the hook-in strip.
11.8 Hook-in the stainless steel housing.
11.9 Mark the other drill holes.
11.10 Remove the stainless steel housing.
11.11 Drill according to the markings.
Insert the dowels.
11.12 Only when the water connection is from the rear: Bring forward work steps
11.16.
11.13 Hook the stainless steel housing into the hook-in strip and fasten with screws.
11.14 Take the hoses together with the water volume regulators and connect them to the
hot and cold water lines.
11.15 Use a hollow hexagon wrench to open the water volume regulators.
d: closed
e: open
11.16 Check the water connections for leaks.

12. Function

Triggering water flow
12.1 Press the grip cap.
• Water flows.
• Water flow stops automatically after a set flow duration.
The flow duration can be set in the range 1–50 s.
Selecting the temperature
- 6 -
11.14
to

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Aqua710Aqrm683Aqua712

Tabla de contenido