Descargar Imprimir esta página

tau LUXE-M Manual De Uso Y Mantenimiento página 19

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 51
6.2 Cables typology
Connection
230v supply
Photocell transmitters
Photocell receivers
Accessory 24v power supply
Control devices
Aerial
Metal mass sensor
NOTE: If the length of the cables is not as stated in the table, determine the cable section on the basis of the real draw
of the connected devices and in compliance with the IEC EN 60204-1 Standard.
As to connections with numerous loads on the same line (in sequence), dimensions must be recalculated on the basis
of the real draw and distance. As to the connection of any products not dealt with in this manual, the documents at-
tached to the products themselves must be consulted.
6.3 Automation base preparation
B
A
6.4 Installation of the barrier group
Cable l.
Type of cable
1 < 10 m
3 x 1,5 mm²
2 x 0,5 mm²
FROR CEI 20-22
4 x 0,5 mm²
CEI EN 50267-2-1
2 x 0,5 mm²
2 x 0,5 mm²
RG58
Without bar and spring, the barrier must be positioned as follows:
-
remove nuts and washers from the protruding bolts, position the cabinet on the base
and fix it. Check it is anchored securely and correct if necessary.
Note: it is advisable to install the cabinet with the door on the side more easily accessible.
-
Open the door with the relative key and remove.
LUXE-M is normally delivered RIGHT (RH), with the bar support in a horizontal position.
Right-hand barriers (RH) are barriers that have the cabinet on the right-hand side viewed
from the inside of the passageway (the door is normally on the inside). If it is necessary for
it to be LEFT (LH), the opening must be inverted.
Cable l.
10 < 20 m
3 x 2,5 mm²
2 x 0,5 mm²
4 x 0,5 mm²
2 x 1 mm²
2 x 0,5 mm²
Cable supplied
See relative instructions
Wall the foundation plate so that the bar-
rier door and the releasing handle are easy
to access.
Create a rectangular, suitably sized floor slab (A
pic.4) with the holes for the exiting cables. Use the
foundation counterplate (B pic. 4), with the 4 an-
chors supplied to be buried in concrete; or, once the
floor slab is completed, fix the cabinet to the barrier
with 4 M10x120 foundation plugs (C pic. 4). The slab
thickness must be at least 10cm and can be increa-
sed as required.
Fig.4
19
Cable l.
20 < 30 m
3 x 4 mm²
-
-
-
2 x 0,5 mm²

Publicidad

loading