Descargar Imprimir esta página

Pentair OMNIFILTER OM26KCS Instrucciones De Instalación página 12

Publicidad

Idiomas disponibles

Idiomas disponibles

RECHARGE continued
OM32KCS Recharge Cycles:
Table 1
Cycle
Cycle Description HE Setting Sd Setting HC Setting
1
Refill
2
Brine Prep
3
Backwash 1
4*
Brine Draw
5*
Slow Rinse
6
Re-Pressurize
7
Fast Rinse 1
8
Backwash 2
9
Fast Rinse 2
Table 2
Cycle
Cycle Description HE Setting Sd Setting HC Setting
1
Refill
2
Brine Prep
3
Backwash 1
4*
Brine Draw
5*
Slow Rinse
6
Re-Pressurize
7
Fast Rinse 1
8
Backwash 2
9
Fast Rinse 2
*The camshaft does not move between cycles 4 and 5 . Cycle 5 begins
when the brine in the salt tank runs out and the check valve closes .
OM36KCS Recharge Cycles:
Table 1
Cycle
Cycle Description HE Setting Sd Setting HC Setting
1
Refill
2
Brine Prep
3
Backwash 1
4*
Brine Draw
5*
Slow Rinse
6
Re-Pressurize
7
Fast Rinse 1
8
Backwash 2
9
Fast Rinse 2
Table 2
Cycle
Cycle Description HE Setting Sd Setting HC Setting
1
Refill
2
Brine Prep
3
Backwash 1
4*
Brine Draw
5*
Slow Rinse
6
Re-Pressurize
7
Fast Rinse 1
8
Backwash 2
9
Fast Rinse 2
*The camshaft does not move between cycles 4 and 5 . Cycle 5 begins
when the brine in the salt tank runs out and the check valve closes .
12 •
Length of Cycle
3 .5 min
10 .5 min
16 min
120 min
120 min
120 min
8 min
8 min
8 min
6 min
19 min
30 min
35 min
35 min
35 min
3 min
3 min
3 min
3 min
3 min
3 min
1 min
1 min
1 min
1 min
1 min
1 min
Time remaining to end of cycle
182 min
202 min
219 min
179 min
192 min
203 min
59 min
72 min
83 min
51 min
64 min
75 min
45 min
45 min
45 min
10 min
10 min
10 min
7 min
7 min
7 min
4 min
4 min
4 min
3 min
3 min
3 min
Length of Cycle
3 .6 min
11 min
17 .48 min
120 min
120 min
120 min
8 min
8 min
8 min
7 min
18 min
23 min
36 min
36 min
36 min
3 min
3 min
3 min
3 min
3 min
3 min
1 min
1 min
1 min
1 min
1 min
1 min
Time remaining to end of cycle
183 min
203 min
214 min
181 min
192 min
197 min
61 min
72 min
77 min
53 min
64 min
69 min
46 min
46 min
46 min
10 min
10 min
10 min
7 min
7 min
7 min
4 min
4 min
4 min
3 min
3 min
3 min
OM40KCS Recharge Cycles:
Table 1
Cycle
Cycle Description HE Setting Sd Setting HC Setting
1
Refill
2
Brine Prep
3
Backwash 1
4*
Brine Draw
5*
Slow Rinse
6
Re-Pressurize
7
Fast Rinse 1
8
Backwash 2
9
Fast Rinse 2
Table 2
Cycle
Cycle Description HE Setting Sd Setting HC Setting
1
Refill
2
Brine Prep
3
Backwash 1
4*
Brine Draw
5*
Slow Rinse
6
Re-Pressurize
7
Fast Rinse 1
8
Backwash 2
9
Fast Rinse 2
*The camshaft does not move between cycles 4 and 5 . Cycle 5 begins
when the brine in the salt tank runs out and the check valve closes .
Recharge Cycle Requirements:
HE
Salt/Recharge
2 .7
(lbs)
Regeneration
62
Time (Min)
Water to Drain
37 .5
(gal)
Max . Flow to
2 .1
Drain (gpm)
HE
Salt/Recharge
3 .3
(lbs)
Regeneration
60 .5
Time (Min)
Water to Drain
47 .4
(gal)
Max . Flow to
2 .7
Drain (gpm)
HE
Salt/Recharge
3 .6
(lbs)
Regeneration
63
Time (Min)
Water to Drain
48 .2
(gal)
Max . Flow to
2 .7
Drain (gpm)
Length of Cycle
4 .1 min
13 .0 min
20 .1 min
120 min
120 min
120 min
8 min
8 min
8 min
8 min
24 min
36 min
43 min
43 min
43 min
3 min
3 min
3 min
3 min
3 min
3 min
1 min
1 min
1 min
1 min
1 min
1 min
Time remaining to end of cycle
193 .1 min
205 .0 min
237 .1 min
189 min
192 min
217 min
69 min
72 min
97 min
61 min
64 min
89 min
53 min
53 min
53 min
10 min
10 min
10 min
7 min
7 min
7 min
4 min
4 min
4 min
3 min
3 min
3 min
OM26KCS
Sd
HC
8 .5
13 .2
82 .5
96
43 .2
46 .6
2 .1
2 .1
OM32KCS
Sd
HC
10 .4
16
80 .5
97
51 .8
57 .1
2 .7
2 .7
OM36KCS
Sd
HC
11 .3
17 .5
85 .5
100 .5
55 .4
59 .7
2 .7
2 .7

Publicidad

loading

Este manual también es adecuado para:

Omnifilter om32kcsOmnifilter om36kcsOmnifilter om40kcs