Descargar Imprimir esta página

Dometic Marine Climate System MCS10 Instrucciones De Montaje página 19

Ocultar thumbs Ver también para Marine Climate System MCS10:

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 85
MCS5, MCS10, MCS15
➤ Attach a 5/8
secure with stainless steel hose clamps.
➤ Install the condensate drain hose downhill from the unit and aft to a
sump.
The hose should have a trap.
I
NOTE
 Two drain fittings may be used and the hoses teed together provided
there is a minimum 51 mm drop from the bottom of the base pan to
the tee connection.
 Consideration should be given to installing a trap in the condensate
drain line(s) so that normal discharge of condensate can fill the trap
and prevent the ingress of carbon monoxide (CO) or other potentially
harmful vapors.
➤ Test the installation by pouring one liter of water into the pan and
checking for good flow.
8.3
Blower Assembly
Horizontal or vertical supply-air discharge may be achieved by rotating
the blower (fig. 4 1, page 4). Rotate the blower to allow the most direct
flow of air to the supply-air grille
8.3.1
MCS5
➤ Remove wire tie holding blower wire harness to base pan and/or
adjacent harness.
➤ Remove and save the 7 screws (fig. 4 5, page 4) holding the blower
plate to the evaporator shroud.
➤ Rotate the blower 90° so the discharge is in the vertical position and
aimed upward.
➤ Reinstall the 7 screws to hold the blower plate to the evaporator
shroud.
➤ Make sure the power wire is repositioned so it will not catch on any-
thing during or after installation.
✓ The vertical rotation is complete.
EN
(16 mm) I.D. reinforced hose to the hose barb and
"
Installation
19

Publicidad

loading

Este manual también es adecuado para:

Marine climate system mcs5Marine climate system mcs15