 Opening a ceiling and
installation of hanging bolts
• Consider the piping / wiring after the unit is hung to
determine the location of the indoor unit installation
and orientation.
• After the location of the indoor unit installation has
been determined, open the ceiling and install
hanging bolts.
• The dimensions of the ceiling opening and hanging
bolt pitches are given in the outline drawing and the
attached installation pattern.
• When a ceiling already exists, lay the drain pipe,
refrigerant pipe, control wires, and remote controller
wires to their connection locations before hanging
the indoor unit.
Procure hanging bolts and nuts for installing the indoor
unit (these are not supplied).
Hanging bolt
M10 or W3/8
4 pieces
Nut
M10 or W3/8
12 pieces
Using the installation pattern (accessory)
The installation pattern is provided inside the
packaging cap.
<For existing ceiling>
Use the installation pattern positioning a ceiling
opening and hanging bolts.
<For new ceiling>
Use the installation pattern to position the ceiling
opening when a ceiling is hanged.
• After the hanging bolts have been installed, install
the indoor unit.
• After loosening the panel mounting screws of the
indoor unit, hook them on the four holes in the
installation pattern.
• When hanging a ceiling, open the ceiling along the
outside dimensions of the installation pattern.
Indoor unit
Panel mounting
screw
Push in the panel mounting
Installation pattern
screw into this hole to set the
(Accessory)
installation pattern
99-EN
Treatment of ceiling
The ceiling differs according to structure of building.
For details, consult your constructor or interior finish
contractor.
In the process after the ceiling board has been
removed, it is important to reinforce ceiling foundation
(frame) and to keep horizontal level of installed ceiling
correctly in order to prevent vibration of ceiling board.
1. Cut and remove the ceiling foundation.
2. Reinforce the cut surface of ceiling foundation, and
add ceiling foundation for fixing the end of ceiling
board.
Installation of hanging bolt
Use M10 hanging bolts (4 pcs, locally procured).
Matching to the existing structure, set pitch according
to size in the unit external view as shown below.
New concrete slab
Install the bolts with insert brackets or anchor bolts.
Rubber
Anchor bolt
(Slide type
(Blade type
(Pipe hanging
bracket)
bracket)
anchor bolt)
Steel flame structure
Use existing angles or install new support angles.
Hanging bolt
Hanging bolt
Support angle
Existing concrete slab
Use a hole-in anchors, hole-in plugs, or a hole-in bolts.
Installation of ceiling opening and
hanging bolt
Hanging bolt
Level
Hanging bracket
• Attach a nut (locally procured) and the washer
(accessory) to each hanging bolt.
• Insert a washer on both sides of the T groove of the
hanging bracket of the indoor unit, and hang the
indoor unit.
• Check that the four sides of the indoor unit are level
using a level gauge (levelness: 5 mm or less).
• Detach the installation gauge (accessory) from the
installation pattern.
• Using the installation gauge, check and adjust the
positional relation between the indoor unit and the
ceiling opening (1) (10 - 35 mm: 4 sides) and the
hanging-up height (2) (12 - 17 mm: 4 corners).
(How to use the installation gauge is printed on the
gauge.)
* Procure hanging bolts
and nuts locally.
Hanging bolt
M10 or W3/8
Nut M10 or
Washer (Accessory)
W3/8
To prevent the bolt
from falling off (for
Eccentric washer
safety), be sure to set
(Accessory)
it just under the
hanging bracket as
* Install with the marking
shown in the figure.
"UP" facing up.
Nut
M10 or W3/8
– 50 –
Level gauge (levelness: 5 mm or less)
Hanging bolt
Indoor unit
Hanging
bracket
(1) 10 - 35 mm
Ceiling
board
Installation gauge
Indoor unit
(2) 12 - 17 mm
(1) 10 - 35 mm
Installation gauge
Ceiling board
CAUTION
CAUTION
Before installation of the indoor unit, remove the tape
that holds the fan and bell mouth. Running the unit
without removing the tape may damage the fan motor.
100-EN

Publicidad

loading

Este manual también es adecuado para:

Rav-hm801ut-eRav-hm1101ut-eRav-hm1401ut-e