Descargar Imprimir esta página

Kohler K-1173-GCR-96 Guía De Instalación Y Cuidado página 8

Publicidad

Idiomas disponibles

Idiomas disponibles

4. Disconnect the Blower Motor - Remote Site
NOTICE: This section applies only to installations in which the blower motor is being relocated.
Remove the Blower Motor
Disconnect the blower motor electrical plug from the control.
Remove any cable ties that support the blower motor cord.
Cut the PVC tube between the tee and the blower.
Remove and retain the four screws from the baseboard.
Remove the blower motor from the bath.
Prepare the Site
NOTE: Refer to the "Prepare the Blower - Remote Site" section for blower relocation details.
Prepare the site where the blower motor will be installed. The site must be within 15' (4.5 m) of the
bath.
Install an access panel to service the blower motor.
Prepare the routing paths for the PVC piping and the new blower motor power cable. Follow all
applicable codes.
1199249-2-D
Blower Motor
Mounting Screws
Cover
Junction Box
Baseboard
Cut Pipe
Control
To Blower Motor
Blower Motor
Electrical Plug
8
Kohler Co.

Publicidad

loading

Este manual también es adecuado para:

K-1173-g-96