Descargar Imprimir esta página

GE UVC9420 Manual Del Propietario E Instalación página 12

Campanas de inserción estándares con extractor quietboost
Ocultar thumbs Ver también para UVC9420:

Publicidad

Idiomas disponibles

Idiomas disponibles

CABINET STRUCTURE
It is required two 2 x 4 horizontal studs separated
by 39" as part of the cabinet. They must be firmly
secured to the cabinet structure.
The cabinet bottom must be made from a wooden
surface ¾" minimum thickness.
WARNING
bottom surface are firmly secured and able to
withstand 100 pounds.
CABINET PREPARATION
12
Installation Preparation - UVC 9420
2" Min.
2" Min.
39" Between
Studs
Make sure the studs and cabinet
C L
FRONT VIEW
CUSTOM CABINET FRAME
The custom canopy or cabinet must have a
rectangular opening to accommodate the custom
hood insert by itself. This opening has the same
size for both a wall installation or an island
installation. Ensure parallelism and levelness of
the cabinet so that it doesn't affect flushness of
the hood with the cabinet.
21-1/4"
39"
13" from
bottom of
cabinet to
bottom of
house duct
Front of
opening is
recommended
to be 2"
minimum from
cabinet front
Back of
opening is
recommended
to be 2"
minimum from
back wall
7-5/8"
C L
18-1/2" Min.
15"
SIDE VIEW
49-2000930 Rev. 1

Publicidad

loading

Este manual también es adecuado para:

Uvc9480Uvc9420slssUvc9480slss